473 solar permits were issued in the City of Spokane, April 2024 through March 2026: about 236 a year and 1% of all permits. 150 solar permits in the last 12 months on file (Apr 2025–Mar 2026), 54% fewer than the 323 in the 12 months before. The busiest month is June.

473permits issued
150last 12 months on file
Junbusiest month
82%finished
Mar 2026records through

Solar permits by month

Permits issued each month, April 2024 through March 2026.

Apr 2024: 38Apr2024May 2024: 54Jun 2024: 54Jul 2024: 26JulAug 2024: 26Sep 2024: 22Oct 2024: 21Nov 2024: 14Dec 2024: 19Jan 2025: 14Jan2025Feb 2025: 11Mar 2025: 24Apr 2025: 25May 2025: 19Jun 2025: 21Jul 2025: 14JulAug 2025: 9Sep 2025: 21Oct 2025: 20Nov 2025: 3Dec 2025: 5Jan 2026: 10Jan2026Feb 2026: 1Mar 2026: 2
The same numbers as a table
MonthPermits
Apr 202438
May 202454
Jun 202454
Jul 202426
Aug 202426
Sep 202422
Oct 202421
Nov 202414
Dec 202419
Jan 202514
Feb 202511
Mar 202524
Apr 202525
May 202519
Jun 202521
Jul 202514
Aug 20259
Sep 202521
Oct 202520
Nov 20253
Dec 20255
Jan 202610
Feb 20261
Mar 20262

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (190), February the quietest (30). A busy month at the permit counter usually means a longer wait for a contractor.

January: 61 (100 = an average month)February: 30 (100 = an average month)March: 66 (100 = an average month)April: 160 (100 = an average month)May: 185 (100 = an average month)June: 190 (100 = an average month)190July: 101 (100 = an average month)August: 89 (100 = an average month)September: 109 (100 = an average month)October: 104 (100 = an average month)November: 43 (100 = an average month)December: 61 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January61
February30
March66
April160
May185
June190
July101
August89
September109
October104
November43
December61

Download this table (CSV)

How many solar permits get finished

Permits issued Apr 2024–Mar 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Apr 2024–Mar 2025323
Finished82.4%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Solar Energy Permit30264%
Solar Energy Permit with SolarApp+15733%
Electrical ePermit-New Bldgs & Addtns92%
Electrical ePermit - Remodels51%

Download this table (CSV)

How Spokane compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Spokane GIS, Permit (Building and Engineering Permits) layer behind the Permit Activity Map, read 19 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Spokane issues inside city limits: residential and commercial building, electrical, mechanical, plumbing, roofing/siding/window, solar, fence, demolition, pool, manufactured-home and sign permits. Side sewer, water and right-of-way permits from the city's Engineering side, planning cases and short-term rental licences are not counted. Spokane Valley, Liberty Lake and unincorporated Spokane County run their own permit offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Spokane.
  • The layer has no issue date, so a permit is dated by the day it was opened; permits the layer still shows in review are not counted.
  • The city keeps only the last three calendar years in this layer and last refreshed it in April 2026, so these pages end with March 2026.
  • The layer has no job value and no final inspection date, so we show no costs and no time to final. A permit counts as finished when the city marks it final, finaled or closed.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count several times.
  • Homes are residential building permits, manufactured-home permits and trade permits on parcels the Spokane County Assessor classes as one to four homes. The layer has no ZIP code, so there is no split by ZIP code.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in the City of Spokane, WA", https://contractorrecords.com/spokane/solar-permits, data through March 2026, from City of Spokane Development Services Center building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: finished share · Solar permits by permit type.

Common questions

  • How many solar permits does Spokane issue a year?About 236 a year in the City of Spokane: 473 permits issued April 2024 through March 2026, 150 of them in the last 12 months on file (to March 2026).
  • When do people in Spokane file the most solar permits?June (190 against an average month of 100); February is the quietest (30). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.