New home permits in the City of Spokane, WA

Data through March 2026 · updated 19 Oct 2026

330 new home permits were issued in the City of Spokane, April 2024 through March 2026: about 165 a year and under 1% of all permits. 108 new home permits in the last 12 months on file (Apr 2025–Mar 2026), 51% fewer than the 222 in the 12 months before. The busiest month is October.

330permits issued
108last 12 months on file
Octbusiest month
85%finished
Mar 2026records through

New home permits by month

Permits issued each month, April 2024 through March 2026.

Apr 2024: 3Apr2024May 2024: 12Jun 2024: 29Jul 2024: 22JulAug 2024: 21Sep 2024: 33Oct 2024: 28Nov 2024: 5Dec 2024: 14Jan 2025: 20Jan2025Feb 2025: 11Mar 2025: 24Apr 2025: 22May 2025: 14Jun 2025: 10Jul 2025: 11JulAug 2025: 5Sep 2025: 13Oct 2025: 19Nov 2025: 4Dec 2025: 3Jan 2026: 2Jan2026Feb 2026: 1Mar 2026: 4
The same numbers as a table
MonthPermits
Apr 20243
May 202412
Jun 202429
Jul 202422
Aug 202421
Sep 202433
Oct 202428
Nov 20245
Dec 202414
Jan 202520
Feb 202511
Mar 202524
Apr 202522
May 202514
Jun 202510
Jul 202511
Aug 20255
Sep 202513
Oct 202519
Nov 20254
Dec 20253
Jan 20262
Feb 20261
Mar 20264

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (171), November the quietest (33). A busy month at the permit counter usually means a longer wait for a contractor.

January: 80 (100 = an average month)February: 44 (100 = an average month)March: 102 (100 = an average month)April: 91 (100 = an average month)May: 95 (100 = an average month)June: 142 (100 = an average month)July: 120 (100 = an average month)August: 95 (100 = an average month)September: 167 (100 = an average month)October: 171 (100 = an average month)171November: 33 (100 = an average month)December: 62 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January80
February44
March102
April91
May95
June142
July120
August95
September167
October171
November33
December62

Download this table (CSV)

How many new home permits get finished

Permits issued Apr 2024–Mar 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Apr 2024–Mar 2025222
Finished85.1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Building Permit31696%
Manufactured Structure Permit144%

Download this table (CSV)

How Spokane compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Spokane GIS, Permit (Building and Engineering Permits) layer behind the Permit Activity Map, read 19 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Spokane issues inside city limits: residential and commercial building, electrical, mechanical, plumbing, roofing/siding/window, solar, fence, demolition, pool, manufactured-home and sign permits. Side sewer, water and right-of-way permits from the city's Engineering side, planning cases and short-term rental licences are not counted. Spokane Valley, Liberty Lake and unincorporated Spokane County run their own permit offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Spokane.
  • The layer has no issue date, so a permit is dated by the day it was opened; permits the layer still shows in review are not counted.
  • The city keeps only the last three calendar years in this layer and last refreshed it in April 2026, so these pages end with March 2026.
  • The layer has no job value and no final inspection date, so we show no costs and no time to final. A permit counts as finished when the city marks it final, finaled or closed.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count several times.
  • Homes are residential building permits, manufactured-home permits and trade permits on parcels the Spokane County Assessor classes as one to four homes. The layer has no ZIP code, so there is no split by ZIP code.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the City of Spokane, WA", https://contractorrecords.com/spokane/new-home-permits, data through March 2026, from City of Spokane Development Services Center building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: finished share · New homes permits by permit type.

Common questions

  • How many new home permits does Spokane issue a year?About 165 a year in the City of Spokane: 330 permits issued April 2024 through March 2026, 108 of them in the last 12 months on file (to March 2026).
  • When do people in Spokane file the most new home permits?October (171 against an average month of 100); November is the quietest (33). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.