Contractor Records
Home › Guides › Tempe building permit search: how to look up permits on an address

Tempe building permit search: how to look up permits on an address

To look up a building permit in Tempe, Arizona, use Tempe Citizen Access, the City's Accela self-service portal; its Building Permits section lists "Search building permit records" (Citizen Access guide). The building search takes an address, record number, parcel number, contact or licensed professional (business name or state licence number) (checked 24 October 2026). The same permits are published on Tempe Open Data, the source of our 4,748 Tempe permits issued October 2024 to September 2026.

By Contractor Records · data through October 19, 2026

Which addresses this covers

The City of Tempe Building Safety Division issues building, trade, pool, sign and demolition permits inside city limits only. Phoenix, Mesa, Chandler, Scottsdale and unincorporated Maricopa County have their own permit offices.

Tool Search by What it shows
Tempe Citizen Access Address, record number, parcel, contact, licensed professional Each permit's status, inspections and documents
Permits Issued by Building Safety (open data) Any column: address, permit number Permit type and class, status, issued and completed dates, estimated cost; our source
Permit Center 480-350-4311, permitcenter@tempe.gov Help with the online portal

How to look up the permits on a Tempe address

  1. Confirm the property is inside Tempe city limits.
  2. Open Citizen Access and choose Search by Address in the General Search menu.
  3. Enter the street number and street name, widen the date range if the job is older, and search.
  4. Open each record. Electrical, plumbing and mechanical work is usually its own permit, separate from the building permit.
  5. Read the status and the inspections. Final, Finaled, CofO Issued or Closed means the job is done.
  6. Check the contractor at the Arizona Registrar of Contractors; our Arizona licence guide explains the classes.

What the statuses mean

Status in the city's file What it means Finished in our data?
Final / Finaled Final inspection passed Yes
CofO Issued Certificate of occupancy issued Yes
Closed Closed by the city Yes
Issued Issued, final not recorded Not yet
Expired Lapsed before final No
Applied Not yet issued Not counted

Of permits issued October 2024 to September 2025, 72% were finished by our count. Expiry is common on trade permits: 20.5% of electrical and 20.5% of plumbing permits issued then had expired.

When the record you want is not online

Tempe's open file starts in 2019. For older records, send a Public Records Request Form to CDprr@tempe.gov. The City's Building Safety Public Records page says the average processing time is 20 business days and hard copies are charged by the copy fee schedule. Building permits, certificates of occupancy and commercial plans are kept permanently, but "residential plans are NOT retained permanently; they are destroyed one year after final permit inspection" (read 24 October 2026).

What our Tempe pages add

Our Tempe page counts the city's permit file by kind of work, October 2024 to September 2026. Days to final are for permits issued October 2024 to September 2025 that reached a final.

Kind of work Permits (Oct 2024–Sep 2026) Last 12 months (Oct 2025–Sep 2026) Usual days to final (Oct 2024–Sep 2025 permits)
Electrical 979 536 30
Remodels and repairs 860 463 85
Plumbing 527 254 41
Solar 361 164 44
Additions 151 83 –
Pools and spas 121 47 88
Garages, sheds and shade structures 101 59 –
ADUs and casitas 101 71 –

62% of the 4,748 permits were for homes. The usual permit took 81 days from issue to final (middle half 36 to 190 days) on how long permits take; the permit statistics page has counts by year and month, browse permits lists the rows and permits by ZIP code splits them by area. Whether a job needs a permit is in Do I need a permit?

What this does not tell you

The city's open file leaves the contractor blank on building permits, so we cannot say who did the work or rank firms. The value is the estimated project cost on the permit; electrical, plumbing and mechanical permits are filed as no-value permits. Few roof replacements appear in the file, so roofing has no page.

How we know this

The portal and search options are from Tempe Community Development's Citizen Access guide and the Citizen Access building search page, and the records-request terms from the Building Safety Public Records page, all read 24 October 2026. Our counts are Tempe Open Data's Permits Issued by Building Safety layer, read 19 October 2026: permits issued October 2024 to September 2026, engineering permits left out.

Numbers come from public permit records in 57 cities, data through October 19, 2026. Nobody paid to be on this page and nobody can.

Questions

  • How do I find out if a permit was pulled on my house in Tempe?

    Open Tempe's Citizen Access portal (epermits.tempe.gov), go to the Building tab and use Search by Address with the street number and name. Open each record to see its status and inspections.

  • Can I search Tempe permits by contractor?

    Citizen Access has a Search by Licensed Professional Information option with business name and state licence number fields. The city's open data file leaves the contractor blank on building permits, so our pages do not list firms.

  • How do I get old Tempe permit records or plans?

    Email a public records request form to CDprr@tempe.gov. The City says the average processing time is 20 business days, and that residential plans are destroyed one year after the final permit inspection, while permits and certificates of occupancy are kept permanently.

  • My address says Tempe but the city has no permit for it. Why?

    Phoenix, Mesa, Chandler, Scottsdale and unincorporated Maricopa County issue their own permits. Check which city the parcel is in on the Maricopa County Assessor's map.

  • How long does a Tempe permit take to final?

    For permits issued October 2024 to September 2025 that reached a final, the usual one took 81 days from issue: 30 days for electrical, 41 for plumbing, 44 for solar and 85 for a remodel.

Build your own list

Pick your city and the kind of work. Every firm with a permit on record, sorted by what you value.