Which addresses this covers
The City of Tempe Building Safety Division issues building, trade, pool, sign and demolition permits inside city limits only. Phoenix, Mesa, Chandler, Scottsdale and unincorporated Maricopa County have their own permit offices.
| Tool | Search by | What it shows |
|---|---|---|
| Tempe Citizen Access | Address, record number, parcel, contact, licensed professional | Each permit's status, inspections and documents |
| Permits Issued by Building Safety (open data) | Any column: address, permit number | Permit type and class, status, issued and completed dates, estimated cost; our source |
| Permit Center | 480-350-4311, permitcenter@tempe.gov | Help with the online portal |
How to look up the permits on a Tempe address
- Confirm the property is inside Tempe city limits.
- Open Citizen Access and choose Search by Address in the General Search menu.
- Enter the street number and street name, widen the date range if the job is older, and search.
- Open each record. Electrical, plumbing and mechanical work is usually its own permit, separate from the building permit.
- Read the status and the inspections. Final, Finaled, CofO Issued or Closed means the job is done.
- Check the contractor at the Arizona Registrar of Contractors; our Arizona licence guide explains the classes.
What the statuses mean
| Status in the city's file | What it means | Finished in our data? |
|---|---|---|
| Final / Finaled | Final inspection passed | Yes |
| CofO Issued | Certificate of occupancy issued | Yes |
| Closed | Closed by the city | Yes |
| Issued | Issued, final not recorded | Not yet |
| Expired | Lapsed before final | No |
| Applied | Not yet issued | Not counted |
Of permits issued October 2024 to September 2025, 72% were finished by our count. Expiry is common on trade permits: 20.5% of electrical and 20.5% of plumbing permits issued then had expired.
When the record you want is not online
Tempe's open file starts in 2019. For older records, send a Public Records Request Form to CDprr@tempe.gov. The City's Building Safety Public Records page says the average processing time is 20 business days and hard copies are charged by the copy fee schedule. Building permits, certificates of occupancy and commercial plans are kept permanently, but "residential plans are NOT retained permanently; they are destroyed one year after final permit inspection" (read 24 October 2026).
What our Tempe pages add
Our Tempe page counts the city's permit file by kind of work, October 2024 to September 2026. Days to final are for permits issued October 2024 to September 2025 that reached a final.
| Kind of work | Permits (Oct 2024–Sep 2026) | Last 12 months (Oct 2025–Sep 2026) | Usual days to final (Oct 2024–Sep 2025 permits) |
|---|---|---|---|
| Electrical | 979 | 536 | 30 |
| Remodels and repairs | 860 | 463 | 85 |
| Plumbing | 527 | 254 | 41 |
| Solar | 361 | 164 | 44 |
| Additions | 151 | 83 | – |
| Pools and spas | 121 | 47 | 88 |
| Garages, sheds and shade structures | 101 | 59 | – |
| ADUs and casitas | 101 | 71 | – |
62% of the 4,748 permits were for homes. The usual permit took 81 days from issue to final (middle half 36 to 190 days) on how long permits take; the permit statistics page has counts by year and month, browse permits lists the rows and permits by ZIP code splits them by area. Whether a job needs a permit is in Do I need a permit?
What this does not tell you
The city's open file leaves the contractor blank on building permits, so we cannot say who did the work or rank firms. The value is the estimated project cost on the permit; electrical, plumbing and mechanical permits are filed as no-value permits. Few roof replacements appear in the file, so roofing has no page.
How we know this
The portal and search options are from Tempe Community Development's Citizen Access guide and the Citizen Access building search page, and the records-request terms from the Building Safety Public Records page, all read 24 October 2026. Our counts are Tempe Open Data's Permits Issued by Building Safety layer, read 19 October 2026: permits issued October 2024 to September 2026, engineering permits left out.
Numbers come from public permit records in 57 cities, data through October 19, 2026. Nobody paid to be on this page and nobody can.
Questions
- How do I find out if a permit was pulled on my house in Tempe?
Open Tempe's Citizen Access portal (epermits.tempe.gov), go to the Building tab and use Search by Address with the street number and name. Open each record to see its status and inspections.
- Can I search Tempe permits by contractor?
Citizen Access has a Search by Licensed Professional Information option with business name and state licence number fields. The city's open data file leaves the contractor blank on building permits, so our pages do not list firms.
- How do I get old Tempe permit records or plans?
Email a public records request form to CDprr@tempe.gov. The City says the average processing time is 20 business days, and that residential plans are destroyed one year after the final permit inspection, while permits and certificates of occupancy are kept permanently.
- My address says Tempe but the city has no permit for it. Why?
Phoenix, Mesa, Chandler, Scottsdale and unincorporated Maricopa County issue their own permits. Check which city the parcel is in on the Maricopa County Assessor's map.
- How long does a Tempe permit take to final?
For permits issued October 2024 to September 2025 that reached a final, the usual one took 81 days from issue: 30 days for electrical, 41 for plumbing, 44 for solar and 85 for a remodel.
Build your own list
Pick your city and the kind of work. Every firm with a permit on record, sorted by what you value.
Related guides
- Adams County, CO building permit search: the e-Permit Center, statuses and CORA
- Alachua County building permit search: Citizenserve, statuses and old records
- Anaheim building permit search: Anaheim NEXT and the Building Permit Report
- Arlington, VA building permit search: Permit Arlington lookups and FOIA requests