Demolition permits in New Orleans, LA

Data through September 2026 · updated 18 Oct 2026

666 demolition permits were issued in New Orleans, October 2024 through September 2026: about 333 a year and 2% of all permits. 258 demolition permits in the last 12 months (Oct 2025–Sep 2026), 37% fewer than the 408 in the 12 months before. The busiest month is October. The usual one took 203 days from issue to the city's final. 70126 has the most, 97.

666permits issued
258last 12 months
Octbusiest month
203days, usual issue to final
20%finished
$7,858usual declared value
Sep 2026records through

Demolition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 72Oct2024Nov 2024: 47Dec 2024: 20Jan 2025: 26Jan2025Feb 2025: 29Mar 2025: 20Apr 2025: 22May 2025: 29Jun 2025: 30Jul 2025: 42JulAug 2025: 40Sep 2025: 31Oct 2025: 35Nov 2025: 7Dec 2025: 11Jan 2026: 19Jan2026Feb 2026: 35Mar 2026: 17Apr 2026: 18May 2026: 14Jun 2026: 25Jul 2026: 18JulAug 2026: 31Sep 2026: 28
The same numbers as a table
MonthPermits
Oct 202472
Nov 202447
Dec 202420
Jan 202526
Feb 202529
Mar 202520
Apr 202522
May 202529
Jun 202530
Jul 202542
Aug 202540
Sep 202531
Oct 202535
Nov 20257
Dec 202511
Jan 202619
Feb 202635
Mar 202617
Apr 202618
May 202614
Jun 202625
Jul 202618
Aug 202631
Sep 202628

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (193), December the quietest (56). A busy month at the permit counter usually means a longer wait for a contractor.

January: 81 (100 = an average month)February: 115 (100 = an average month)March: 67 (100 = an average month)April: 72 (100 = an average month)May: 77 (100 = an average month)June: 99 (100 = an average month)July: 108 (100 = an average month)August: 128 (100 = an average month)September: 106 (100 = an average month)October: 193 (100 = an average month)193November: 97 (100 = an average month)December: 56 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January81
February115
March67
April72
May77
June99
July108
August128
September106
October193
November97
December56

Download this table (CSV)

How long a demolition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 78 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025408
Finished20.3%
Expired0.7%
Usual days, issue to final203
Middle half, days86–320

Download this table (CSV)

What a demolition permit is declared at

The value written on the permit at application, from 287 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$7,858
Middle half$5,503–$11,270

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the city's 666 demolition permits.

ZIP codePermitsShare
701269715%
701156410%
70117538%
70118528%
70122467%
70114416%
70124386%
70119376%
70116254%
70131233%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Demolition36355%
City IDC Demolition17226%
Interior Demolition13120%

Download this table (CSV)

How these numbers are made

Source: City of New Orleans, Permits - BLDS (data.nola.gov, dataset 72f9-bi28), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of New Orleans Department of Safety and Permits issues inside the city, which is also Orleans Parish: building, renovation, re-roofing, electrical, plumbing, gas, HVAC, solar, pool, generator and demolition permits for single-family homes, two-family homes and doubles. Permits for buildings with three or more units and commercial property are not counted, nor are historic-district reviews, right-of-way permits (street cuts, driveways, sidewalks) and address changes in the same file. Jefferson, St. Bernard and St. Tammany parishes run their own permit offices and are not in this file.

  • The city's file lists a contractor on most permits, usually the licensed person rather than the company, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for New Orleans.
  • The value is the project cost declared on the application. About a third of permits carry none, mostly small trade permits.
  • Gas permits (gas lines, water heaters and the six-month gas test after a home sits empty) are counted with plumbing; an electrical vacancy permit, needed to turn power back on in a home that sat empty, counts as electrical.
  • The city's file has a residential re-roofing permit type only from May 2025; before that few re-roofs appear in it, so the rise in roofing permits mostly reflects the new permit type, not more roofs.
  • A final date is the day the city recorded the permit as finaled or completed. Permits the city marks Closed count as finished but add no days, because the file does not say whether the work passed a final inspection.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in New Orleans, LA", https://contractorrecords.com/new-orleans/demolition-permits, data through September 2026, from the City of New Orleans Department of Safety and Permits building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: days to final · Demolition permits: declared value · Demolition permits by ZIP code · Demolition permits by permit type.

Common questions

  • How many demolition permits does New Orleans issue a year?About 333 a year in New Orleans: 666 permits issued October 2024 through September 2026, 258 of them in the last 12 months.
  • How long does a demolition permit take in New Orleans?The usual one took 203 days from issue to the city's final inspection, and the middle half took 86 to 320 days (78 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in New Orleans file the most demolition permits?October (193 against an average month of 100); December is the quietest (56). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in New Orleans?70126, with 97 of the 666 (15%); then 70115 (64).