Contractor Records
Home › New Orleans › HVAC

HVAC permits in New Orleans, LA

Data through September 2026 · updated 18 Oct 2026

3,333 HVAC permits were issued in New Orleans, October 2024 through September 2026: about 1,666 a year and 12% of all permits. 1,918 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 36% more than the 1,415 in the 12 months before. The busiest month is May. The usual one took 112 days from issue to the city's final. 70118 has the most, 409.

3,333permits issued
1,918last 12 months
Maybusiest month
112days, usual issue to final
76%finished
$12,284usual declared value
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 105Oct2024Nov 2024: 107Dec 2024: 100Jan 2025: 78Jan2025Feb 2025: 104Mar 2025: 121Apr 2025: 114May 2025: 118Jun 2025: 129Jul 2025: 173JulAug 2025: 141Sep 2025: 125Oct 2025: 157Nov 2025: 130Dec 2025: 99Jan 2026: 133Jan2026Feb 2026: 135Mar 2026: 169Apr 2026: 178May 2026: 228Jun 2026: 195Jul 2026: 171JulAug 2026: 127Sep 2026: 196
The same numbers as a table
MonthPermits
Oct 2024105
Nov 2024107
Dec 2024100
Jan 202578
Feb 2025104
Mar 2025121
Apr 2025114
May 2025118
Jun 2025129
Jul 2025173
Aug 2025141
Sep 2025125
Oct 2025157
Nov 2025130
Dec 202599
Jan 2026133
Feb 2026135
Mar 2026169
Apr 2026178
May 2026228
Jun 2026195
Jul 2026171
Aug 2026127
Sep 2026196

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (125), December the quietest (72). A busy month at the permit counter usually means a longer wait for a contractor.

January: 76 (100 = an average month)February: 86 (100 = an average month)March: 104 (100 = an average month)April: 105 (100 = an average month)May: 125 (100 = an average month)125June: 117 (100 = an average month)July: 124 (100 = an average month)August: 96 (100 = an average month)September: 116 (100 = an average month)October: 94 (100 = an average month)November: 85 (100 = an average month)December: 72 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January76
February86
March104
April105
May125
June117
July124
August96
September116
October94
November85
December72

Download this table (CSV)

How long an HVAC permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,070 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,415
Finished75.9%
Expired0.5%
Usual days, issue to final112
Middle half, days60–192

Download this table (CSV)

What an HVAC permit is declared at

The value written on the permit at application, from 3,317 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$12,284
Middle half$8,000–$17,215

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 3,333 HVAC permits.

ZIP codePermitsShare
7011840912%
7011537411%
7011734910%
7012232010%
701192718%
701242598%
701262397%
701251886%
701311655%
701141585%

Download this table (CSV)

How New Orleans compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of New Orleans, Permits - BLDS (data.nola.gov, dataset 72f9-bi28), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of New Orleans Department of Safety and Permits issues inside the city, which is also Orleans Parish: building, renovation, re-roofing, electrical, plumbing, gas, HVAC, solar, pool, generator and demolition permits for single-family homes, two-family homes and doubles. Permits for buildings with three or more units and commercial property are not counted, nor are historic-district reviews, right-of-way permits (street cuts, driveways, sidewalks) and address changes in the same file. Jefferson, St. Bernard and St. Tammany parishes run their own permit offices and are not in this file.

  • The city's file lists a contractor on most permits, usually the licensed person rather than the company, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for New Orleans.
  • The value is the project cost declared on the application. About a third of permits carry none, mostly small trade permits.
  • Gas permits (gas lines, water heaters and the six-month gas test after a home sits empty) are counted with plumbing; an electrical vacancy permit, needed to turn power back on in a home that sat empty, counts as electrical.
  • The city's file has a residential re-roofing permit type only from May 2025; before that few re-roofs appear in it, so the rise in roofing permits mostly reflects the new permit type, not more roofs.
  • A final date is the day the city recorded the permit as finaled or completed. Permits the city marks Closed count as finished but add no days, because the file does not say whether the work passed a final inspection.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in New Orleans, LA", https://contractorrecords.com/new-orleans/hvac-permits, data through September 2026, from the City of New Orleans Department of Safety and Permits building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: days to final · HVAC permits: declared value · HVAC permits by ZIP code.

Common questions

  • How many HVAC permits does New Orleans issue a year?About 1,666 a year in New Orleans: 3,333 permits issued October 2024 through September 2026, 1,918 of them in the last 12 months.
  • How long does an HVAC permit take in New Orleans?The usual one took 112 days from issue to the city's final inspection, and the middle half took 60 to 192 days (1,070 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in New Orleans file the most HVAC permits?May (125 against an average month of 100); December is the quietest (72). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in New Orleans?70118, with 409 of the 3,333 (12%); then 70115 (374).