Remodel and repair permits in New Orleans, LA

Data through September 2026 · updated 18 Oct 2026

2,172 remodel and repair permits were issued in New Orleans, October 2024 through September 2026: about 1,086 a year and 8% of all permits. 953 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 22% fewer than the 1,219 in the 12 months before. The busiest month is March. The usual one took 155 days from issue to the city's final. 70115 has the most, 208.

2,172permits issued
953last 12 months
Marbusiest month
155days, usual issue to final
54%finished
$30,000usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 113Oct2024Nov 2024: 88Dec 2024: 70Jan 2025: 77Jan2025Feb 2025: 133Mar 2025: 122Apr 2025: 98May 2025: 103Jun 2025: 100Jul 2025: 79JulAug 2025: 139Sep 2025: 97Oct 2025: 94Nov 2025: 105Dec 2025: 70Jan 2026: 81Jan2026Feb 2026: 69Mar 2026: 90Apr 2026: 84May 2026: 75Jun 2026: 65Jul 2026: 70JulAug 2026: 73Sep 2026: 77
The same numbers as a table
MonthPermits
Oct 2024113
Nov 202488
Dec 202470
Jan 202577
Feb 2025133
Mar 2025122
Apr 202598
May 2025103
Jun 2025100
Jul 202579
Aug 2025139
Sep 202597
Oct 202594
Nov 2025105
Dec 202570
Jan 202681
Feb 202669
Mar 202690
Apr 202684
May 202675
Jun 202665
Jul 202670
Aug 202673
Sep 202677

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (117), December the quietest (77). A busy month at the permit counter usually means a longer wait for a contractor.

January: 87 (100 = an average month)February: 112 (100 = an average month)March: 117 (100 = an average month)117April: 101 (100 = an average month)May: 98 (100 = an average month)June: 91 (100 = an average month)July: 82 (100 = an average month)August: 117 (100 = an average month)September: 96 (100 = an average month)October: 114 (100 = an average month)November: 107 (100 = an average month)December: 77 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January87
February112
March117
April101
May98
June91
July82
August117
September96
October114
November107
December77

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 643 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,219
Finished54.4%
Expired0.6%
Usual days, issue to final155
Middle half, days75–286

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 2,139 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$30,000
Middle half$10,262–$75,500

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 2,172 remodel and repair permits.

ZIP codePermitsShare
7011520810%
701171989%
701181808%
701141457%
701191427%
701161286%
701221266%
701241175%
70126924%
70125874%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Renovation (Non-Structural)1,35362%
Renovation (Structural)78836%
Renovation (Structural or Non-structural)311%

Download this table (CSV)

How New Orleans compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of New Orleans, Permits - BLDS (data.nola.gov, dataset 72f9-bi28), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of New Orleans Department of Safety and Permits issues inside the city, which is also Orleans Parish: building, renovation, re-roofing, electrical, plumbing, gas, HVAC, solar, pool, generator and demolition permits for single-family homes, two-family homes and doubles. Permits for buildings with three or more units and commercial property are not counted, nor are historic-district reviews, right-of-way permits (street cuts, driveways, sidewalks) and address changes in the same file. Jefferson, St. Bernard and St. Tammany parishes run their own permit offices and are not in this file.

  • The city's file lists a contractor on most permits, usually the licensed person rather than the company, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for New Orleans.
  • The value is the project cost declared on the application. About a third of permits carry none, mostly small trade permits.
  • Gas permits (gas lines, water heaters and the six-month gas test after a home sits empty) are counted with plumbing; an electrical vacancy permit, needed to turn power back on in a home that sat empty, counts as electrical.
  • The city's file has a residential re-roofing permit type only from May 2025; before that few re-roofs appear in it, so the rise in roofing permits mostly reflects the new permit type, not more roofs.
  • A final date is the day the city recorded the permit as finaled or completed. Permits the city marks Closed count as finished but add no days, because the file does not say whether the work passed a final inspection.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in New Orleans, LA", https://contractorrecords.com/new-orleans/remodel-permits, data through September 2026, from the City of New Orleans Department of Safety and Permits building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does New Orleans issue a year?About 1,086 a year in New Orleans: 2,172 permits issued October 2024 through September 2026, 953 of them in the last 12 months.
  • How long does a remodel and repair permit take in New Orleans?The usual one took 155 days from issue to the city's final inspection, and the middle half took 75 to 286 days (643 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in New Orleans file the most remodel and repair permits?March (117 against an average month of 100); December is the quietest (77). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in New Orleans?70115, with 208 of the 2,172 (10%); then 70117 (198).