Contractor Records
Home › New Orleans › Plumbing

Plumbing permits in New Orleans, LA

Data through September 2026 · updated 18 Oct 2026

7,492 plumbing permits were issued in New Orleans, October 2024 through September 2026: about 3,746 a year and 27% of all permits. 3,843 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 5% more than the 3,649 in the 12 months before. The busiest month is May. The usual one took 41 days from issue to the city's final. 70117 has the most, 802.

7,492permits issued
3,843last 12 months
Maybusiest month
41days, usual issue to final
78%finished
$750usual declared value
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 329Oct2024Nov 2024: 317Dec 2024: 307Jan 2025: 263Jan2025Feb 2025: 318Mar 2025: 265Apr 2025: 288May 2025: 311Jun 2025: 313Jul 2025: 313JulAug 2025: 309Sep 2025: 316Oct 2025: 325Nov 2025: 285Dec 2025: 252Jan 2026: 276Jan2026Feb 2026: 302Mar 2026: 381Apr 2026: 365May 2026: 376Jun 2026: 318Jul 2026: 317JulAug 2026: 314Sep 2026: 332
The same numbers as a table
MonthPermits
Oct 2024329
Nov 2024317
Dec 2024307
Jan 2025263
Feb 2025318
Mar 2025265
Apr 2025288
May 2025311
Jun 2025313
Jul 2025313
Aug 2025309
Sep 2025316
Oct 2025325
Nov 2025285
Dec 2025252
Jan 2026276
Feb 2026302
Mar 2026381
Apr 2026365
May 2026376
Jun 2026318
Jul 2026317
Aug 2026314
Sep 2026332

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (110), January the quietest (86). A busy month at the permit counter usually means a longer wait for a contractor.

January: 86 (100 = an average month)February: 99 (100 = an average month)March: 103 (100 = an average month)April: 105 (100 = an average month)May: 110 (100 = an average month)110June: 101 (100 = an average month)July: 101 (100 = an average month)August: 100 (100 = an average month)September: 104 (100 = an average month)October: 105 (100 = an average month)November: 96 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January86
February99
March103
April105
May110
June101
July101
August100
September104
October105
November96
December90

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 2,713 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20253,649
Finished77.8%
Expired0.5%
Usual days, issue to final41
Middle half, days8–158

Download this table (CSV)

What a plumbing permit is declared at

The value written on the permit at application, from 3,504 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$750
Middle half$400–$2,000

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 7,492 plumbing permits.

ZIP codePermitsShare
7011780211%
7011577010%
7011875810%
701226669%
701196218%
701244666%
701264496%
701144246%
701253785%
701313595%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing Permit3,91852%
Mechanical Fuel Gas3,57448%

Download this table (CSV)

How New Orleans compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of New Orleans, Permits - BLDS (data.nola.gov, dataset 72f9-bi28), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of New Orleans Department of Safety and Permits issues inside the city, which is also Orleans Parish: building, renovation, re-roofing, electrical, plumbing, gas, HVAC, solar, pool, generator and demolition permits for single-family homes, two-family homes and doubles. Permits for buildings with three or more units and commercial property are not counted, nor are historic-district reviews, right-of-way permits (street cuts, driveways, sidewalks) and address changes in the same file. Jefferson, St. Bernard and St. Tammany parishes run their own permit offices and are not in this file.

  • The city's file lists a contractor on most permits, usually the licensed person rather than the company, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for New Orleans.
  • The value is the project cost declared on the application. About a third of permits carry none, mostly small trade permits.
  • Gas permits (gas lines, water heaters and the six-month gas test after a home sits empty) are counted with plumbing; an electrical vacancy permit, needed to turn power back on in a home that sat empty, counts as electrical.
  • The city's file has a residential re-roofing permit type only from May 2025; before that few re-roofs appear in it, so the rise in roofing permits mostly reflects the new permit type, not more roofs.
  • A final date is the day the city recorded the permit as finaled or completed. Permits the city marks Closed count as finished but add no days, because the file does not say whether the work passed a final inspection.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in New Orleans, LA", https://contractorrecords.com/new-orleans/plumbing-permits, data through September 2026, from the City of New Orleans Department of Safety and Permits building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits: declared value · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does New Orleans issue a year?About 3,746 a year in New Orleans: 7,492 permits issued October 2024 through September 2026, 3,843 of them in the last 12 months.
  • How long does a plumbing permit take in New Orleans?The usual one took 41 days from issue to the city's final inspection, and the middle half took 8 to 158 days (2,713 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in New Orleans file the most plumbing permits?May (110 against an average month of 100); January is the quietest (86). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in New Orleans?70117, with 802 of the 7,492 (11%); then 70115 (770).