Contractor Records
Home › New Orleans › ZIP 70130

Building permits in 70130, New Orleans

Data through September 2026 · updated 18 Oct 2026

751 building permits were issued in ZIP code 70130 by the City of New Orleans Department of Safety and Permits, October 2024 through September 2026: 3% of the 27,739 in New Orleans, the 14th busiest ZIP code. Electrical permits lead with 280. 372 permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 379 in the 12 months before. Permits from a city that runs its own permit office are not counted.

751permits in 70130
372last 12 months
100%for homes
98days, usual issue to final
Sep 2026records through

Permits in 70130 by kind of work

Share here is the part of the 751 permits in 70130; citywide is the same for all of New Orleans.

Kind of workPermitsShare hereCitywide
Electrical28037%35%
Plumbing19526%27%
HVAC9813%12%
Remodels & repairs649%8%
Roofing426%6%
Pools & spas213%1%
Solar152%4%
Additions152%1%
Demolition91%2%
Garages, sheds & shade structures7under 1%under 1%
New homes4under 1%3%
Fences & walls1under 1%under 1%

Download this table (CSV)

Permits in 70130 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)385340
202512368368
2026 (through September)9298397

Download this table (CSV)

How permits in 70130 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure70130Citywide
Permits issued Oct 2024–Sep 202537913,725
Finished67.0%69.9%
Expired0.5%0.9%
Usual days, issue to final9872

Download this table (CSV)

How these numbers are made

Source: City of New Orleans, Permits - BLDS (data.nola.gov, dataset 72f9-bi28), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of New Orleans Department of Safety and Permits issues inside the city, which is also Orleans Parish: building, renovation, re-roofing, electrical, plumbing, gas, HVAC, solar, pool, generator and demolition permits for single-family homes, two-family homes and doubles. Permits for buildings with three or more units and commercial property are not counted, nor are historic-district reviews, right-of-way permits (street cuts, driveways, sidewalks) and address changes in the same file. Jefferson, St. Bernard and St. Tammany parishes run their own permit offices and are not in this file.

  • The city's file lists a contractor on most permits, usually the licensed person rather than the company, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for New Orleans.
  • The value is the project cost declared on the application. About a third of permits carry none, mostly small trade permits.
  • Gas permits (gas lines, water heaters and the six-month gas test after a home sits empty) are counted with plumbing; an electrical vacancy permit, needed to turn power back on in a home that sat empty, counts as electrical.
  • The city's file has a residential re-roofing permit type only from May 2025; before that few re-roofs appear in it, so the rise in roofing permits mostly reflects the new permit type, not more roofs.
  • A final date is the day the city recorded the permit as finaled or completed. Permits the city marks Closed count as finished but add no days, because the file does not say whether the work passed a final inspection.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 70130, New Orleans", https://contractorrecords.com/new-orleans/zip/70130, data through September 2026, from the City of New Orleans Department of Safety and Permits building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 70130 by kind of work · Permits in 70130 by year · Permits in 70130: finished and days to final.

Common questions

  • How many building permits were issued in 70130?751 permits issued by the city in ZIP code 70130, October 2024 through September 2026: 280 electrical, 195 plumbing, 98 HVAC. 372 were in the last 12 months.
  • What is built most in 70130?Electrical: 280 of the 751 permits (37%), against 35% citywide.
  • How long does a permit take in 70130?The usual permit issued here Oct 2024–Sep 2025 took 98 days from issue to final (235 permits with a final date), against 72 days citywide.
  • Who did the work in 70130?The city's file names contractors, but we haven't matched those names to state license records, so we don't rate, rank or profile firms from it, so we don't list them by ZIP code. Ask a contractor for the permit numbers of past jobs and check them with the city.