Contractor Records
Home › Virginia Beach › Additions

Home addition permits in Virginia Beach, VA

Data through September 2026 · updated 18 Oct 2026

1,010 home addition permits were issued in Virginia Beach, October 2024 through September 2026: about 505 a year and 3% of all permits. 458 home addition permits in the last 12 months (Oct 2025–Sep 2026), 17% fewer than the 552 in the 12 months before. The busiest month is October. The usual one took 133 days from issue to the city's final. 23451 has the most, 180.

1,010permits issued
458last 12 months
Octbusiest month
133days, usual issue to final
70%finished
Sep 2026records through

Home addition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 64Oct2024Nov 2024: 42Dec 2024: 39Jan 2025: 36Jan2025Feb 2025: 36Mar 2025: 57Apr 2025: 57May 2025: 54Jun 2025: 37Jul 2025: 43JulAug 2025: 39Sep 2025: 48Oct 2025: 52Nov 2025: 37Dec 2025: 29Jan 2026: 37Jan2026Feb 2026: 25Mar 2026: 48Apr 2026: 30May 2026: 46Jun 2026: 38Jul 2026: 39JulAug 2026: 41Sep 2026: 36
The same numbers as a table
MonthPermits
Oct 202464
Nov 202442
Dec 202439
Jan 202536
Feb 202536
Mar 202557
Apr 202557
May 202554
Jun 202537
Jul 202543
Aug 202539
Sep 202548
Oct 202552
Nov 202537
Dec 202529
Jan 202637
Feb 202625
Mar 202648
Apr 202630
May 202646
Jun 202638
Jul 202639
Aug 202641
Sep 202636

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (138), February the quietest (72). A busy month at the permit counter usually means a longer wait for a contractor.

January: 87 (100 = an average month)February: 72 (100 = an average month)March: 125 (100 = an average month)April: 103 (100 = an average month)May: 119 (100 = an average month)June: 89 (100 = an average month)July: 97 (100 = an average month)August: 95 (100 = an average month)September: 100 (100 = an average month)October: 138 (100 = an average month)138November: 94 (100 = an average month)December: 81 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January87
February72
March125
April103
May119
June89
July97
August95
September100
October138
November94
December81

Download this table (CSV)

How long a home addition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 382 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025552
Finished69.9%
Expired0.2%
Usual days, issue to final133
Middle half, days65–238

Download this table (CSV)

ZIP codes with the most home addition permits

Counted at the property's ZIP code. Share is the part of the city's 1,010 home addition permits.

ZIP codePermitsShare
2345118018%
2345617918%
2345416416%
2345513814%
2345212012%
2346411211%
23462495%
23453404%
23457273%

Download this table (CSV)

How these numbers are made

Source: City of Virginia Beach Open Data, Building Permits Applications (data.virginiabeach.gov, ArcGIS layer Building_Permits_Applications_view), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Virginia Beach issues inside the city: building, electrical, mechanical, plumbing and gas permits for homes, plus the city's roof and siding permits. Commercial permits, moving and hauling, utility, civil site work, fire, elevator and amusement permits in the same file are not counted. Norfolk, Chesapeake and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor (its 'created by' field is a portal login), so there are no contractor lists, rankings or firm pages for Virginia Beach.
  • The file has no declared job value, so we show no costs.
  • Roof and siding permits are their own type in the file, with no homes-or-business split, so all of them are counted here. Solar, pools, fences, additions and sheds are sorted out of the city's broad 'addition and or alteration' building permits by their work description; decks, piers and bulkheads count under Other.
  • A permit counts as finished when the city marks it Final or Closed or gives it a final date. Closed also covers permits that needed no final inspection.
  • The data made available here has been modified for use from its original source, which is the City of Virginia Beach. Neither the City of Virginia Beach nor the Office of the Chief Information Officer (CIO) makes any claims as to the completeness, timeliness, accuracy or content of any data contained in this application; makes any representation of any kind, including, but not limited to, warranty of the accuracy or fitness for a particular use; nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. The data is subject to change as modifications and updates are complete. It is understood that the information contained in the web feed is being used at one's own risk.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in Virginia Beach, VA", https://contractorrecords.com/virginia-beach/addition-permits, data through September 2026, from the City of Virginia Beach Planning Department, Permits Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: days to final · Additions permits by ZIP code.

Common questions

  • How many home addition permits does Virginia Beach issue a year?About 505 a year in Virginia Beach: 1,010 permits issued October 2024 through September 2026, 458 of them in the last 12 months.
  • How long does a home addition permit take in Virginia Beach?The usual one took 133 days from issue to the city's final inspection, and the middle half took 65 to 238 days (382 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Virginia Beach file the most home addition permits?October (138 against an average month of 100); February is the quietest (72). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most home addition permits in Virginia Beach?23451, with 180 of the 1,010 (18%); then 23456 (179).