HVAC permits in Virginia Beach, VA

Data through September 2026 · updated 18 Oct 2026

8,024 HVAC permits were issued in Virginia Beach, October 2024 through September 2026: about 4,012 a year and 23% of all permits. 4,301 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 16% more than the 3,723 in the 12 months before. The busiest month is July. The usual one took 42 days from issue to the city's final. 23456 has the most, 1,557.

8,024permits issued
4,301last 12 months
Julbusiest month
42days, usual issue to final
73%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 270Oct2024Nov 2024: 266Dec 2024: 273Jan 2025: 327Jan2025Feb 2025: 232Mar 2025: 270Apr 2025: 311May 2025: 314Jun 2025: 330Jul 2025: 388JulAug 2025: 428Sep 2025: 314Oct 2025: 355Nov 2025: 281Dec 2025: 386Jan 2026: 327Jan2026Feb 2026: 305Mar 2026: 422Apr 2026: 407May 2026: 324Jun 2026: 446Jul 2026: 398JulAug 2026: 343Sep 2026: 307
The same numbers as a table
MonthPermits
Oct 2024270
Nov 2024266
Dec 2024273
Jan 2025327
Feb 2025232
Mar 2025270
Apr 2025311
May 2025314
Jun 2025330
Jul 2025388
Aug 2025428
Sep 2025314
Oct 2025355
Nov 2025281
Dec 2025386
Jan 2026327
Feb 2026305
Mar 2026422
Apr 2026407
May 2026324
Jun 2026446
Jul 2026398
Aug 2026343
Sep 2026307

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (118), February the quietest (80). A busy month at the permit counter usually means a longer wait for a contractor.

January: 98 (100 = an average month)February: 80 (100 = an average month)March: 103 (100 = an average month)April: 107 (100 = an average month)May: 95 (100 = an average month)June: 116 (100 = an average month)July: 118 (100 = an average month)118August: 115 (100 = an average month)September: 93 (100 = an average month)October: 93 (100 = an average month)November: 82 (100 = an average month)December: 99 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January98
February80
March103
April107
May95
June116
July118
August115
September93
October93
November82
December99

Download this table (CSV)

How long an HVAC permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 2,669 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20253,723
Finished72.8%
Expired0.0%
Usual days, issue to final42
Middle half, days12–120

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 8,024 HVAC permits.

ZIP codePermitsShare
234561,55719%
234541,20015%
234511,12014%
234641,04413%
2345599812%
2345290911%
234627329%
234533835%
2345773under 1%
235461under 1%

Download this table (CSV)

How Virginia Beach compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Virginia Beach Open Data, Building Permits Applications (data.virginiabeach.gov, ArcGIS layer Building_Permits_Applications_view), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Virginia Beach issues inside the city: building, electrical, mechanical, plumbing and gas permits for homes, plus the city's roof and siding permits. Commercial permits, moving and hauling, utility, civil site work, fire, elevator and amusement permits in the same file are not counted. Norfolk, Chesapeake and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor (its 'created by' field is a portal login), so there are no contractor lists, rankings or firm pages for Virginia Beach.
  • The file has no declared job value, so we show no costs.
  • Roof and siding permits are their own type in the file, with no homes-or-business split, so all of them are counted here. Solar, pools, fences, additions and sheds are sorted out of the city's broad 'addition and or alteration' building permits by their work description; decks, piers and bulkheads count under Other.
  • A permit counts as finished when the city marks it Final or Closed or gives it a final date. Closed also covers permits that needed no final inspection.
  • The data made available here has been modified for use from its original source, which is the City of Virginia Beach. Neither the City of Virginia Beach nor the Office of the Chief Information Officer (CIO) makes any claims as to the completeness, timeliness, accuracy or content of any data contained in this application; makes any representation of any kind, including, but not limited to, warranty of the accuracy or fitness for a particular use; nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. The data is subject to change as modifications and updates are complete. It is understood that the information contained in the web feed is being used at one's own risk.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Virginia Beach, VA", https://contractorrecords.com/virginia-beach/hvac-permits, data through September 2026, from the City of Virginia Beach Planning Department, Permits Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: days to final · HVAC permits by ZIP code.

Common questions

  • How many HVAC permits does Virginia Beach issue a year?About 4,012 a year in Virginia Beach: 8,024 permits issued October 2024 through September 2026, 4,301 of them in the last 12 months.
  • How long does an HVAC permit take in Virginia Beach?The usual one took 42 days from issue to the city's final inspection, and the middle half took 12 to 120 days (2,669 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Virginia Beach file the most HVAC permits?July (118 against an average month of 100); February is the quietest (80). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Virginia Beach?23456, with 1,557 of the 8,024 (19%); then 23454 (1,200).