Solar permits in Virginia Beach, VA

Data through September 2026 · updated 18 Oct 2026

2,580 solar permits were issued in Virginia Beach, October 2024 through September 2026: about 1,290 a year and 8% of all permits. 1,313 solar permits in the last 12 months (Oct 2025–Sep 2026), 4% more than the 1,267 in the 12 months before. The busiest month is April. The usual one took 34 days from issue to the city's final. 23464 has the most, 485.

2,580permits issued
1,313last 12 months
Aprbusiest month
34days, usual issue to final
95%finished
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 138Oct2024Nov 2024: 112Dec 2024: 92Jan 2025: 65Jan2025Feb 2025: 85Mar 2025: 95Apr 2025: 132May 2025: 129Jun 2025: 85Jul 2025: 97JulAug 2025: 141Sep 2025: 96Oct 2025: 129Nov 2025: 66Dec 2025: 42Jan 2026: 88Jan2026Feb 2026: 88Mar 2026: 134Apr 2026: 134May 2026: 94Jun 2026: 129Jul 2026: 169JulAug 2026: 118Sep 2026: 122
The same numbers as a table
MonthPermits
Oct 2024138
Nov 2024112
Dec 202492
Jan 202565
Feb 202585
Mar 202595
Apr 2025132
May 2025129
Jun 202585
Jul 202597
Aug 2025141
Sep 202596
Oct 2025129
Nov 202566
Dec 202542
Jan 202688
Feb 202688
Mar 2026134
Apr 2026134
May 202694
Jun 2026129
Jul 2026169
Aug 2026118
Sep 2026122

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (124), December the quietest (62). A busy month at the permit counter usually means a longer wait for a contractor.

January: 71 (100 = an average month)February: 80 (100 = an average month)March: 107 (100 = an average month)April: 124 (100 = an average month)124May: 104 (100 = an average month)June: 100 (100 = an average month)July: 124 (100 = an average month)August: 120 (100 = an average month)September: 101 (100 = an average month)October: 124 (100 = an average month)November: 83 (100 = an average month)December: 62 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January71
February80
March107
April124
May104
June100
July124
August120
September101
October124
November83
December62

Download this table (CSV)

How long a solar permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,133 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,267
Finished94.6%
Expired0.2%
Usual days, issue to final34
Middle half, days21–51

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 2,580 solar permits.

ZIP codePermitsShare
2346448519%
2345243917%
2345336514%
2345636414%
2346235714%
2345427411%
234551998%
23451743%
2345723under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical1,32351%
Building - Addition and or Alteration1,25749%

Download this table (CSV)

How Virginia Beach compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Virginia Beach Open Data, Building Permits Applications (data.virginiabeach.gov, ArcGIS layer Building_Permits_Applications_view), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Virginia Beach issues inside the city: building, electrical, mechanical, plumbing and gas permits for homes, plus the city's roof and siding permits. Commercial permits, moving and hauling, utility, civil site work, fire, elevator and amusement permits in the same file are not counted. Norfolk, Chesapeake and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor (its 'created by' field is a portal login), so there are no contractor lists, rankings or firm pages for Virginia Beach.
  • The file has no declared job value, so we show no costs.
  • Roof and siding permits are their own type in the file, with no homes-or-business split, so all of them are counted here. Solar, pools, fences, additions and sheds are sorted out of the city's broad 'addition and or alteration' building permits by their work description; decks, piers and bulkheads count under Other.
  • A permit counts as finished when the city marks it Final or Closed or gives it a final date. Closed also covers permits that needed no final inspection.
  • The data made available here has been modified for use from its original source, which is the City of Virginia Beach. Neither the City of Virginia Beach nor the Office of the Chief Information Officer (CIO) makes any claims as to the completeness, timeliness, accuracy or content of any data contained in this application; makes any representation of any kind, including, but not limited to, warranty of the accuracy or fitness for a particular use; nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. The data is subject to change as modifications and updates are complete. It is understood that the information contained in the web feed is being used at one's own risk.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Virginia Beach, VA", https://contractorrecords.com/virginia-beach/solar-permits, data through September 2026, from the City of Virginia Beach Planning Department, Permits Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Virginia Beach issue a year?About 1,290 a year in Virginia Beach: 2,580 permits issued October 2024 through September 2026, 1,313 of them in the last 12 months.
  • How long does a solar permit take in Virginia Beach?The usual one took 34 days from issue to the city's final inspection, and the middle half took 21 to 51 days (1,133 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Virginia Beach file the most solar permits?April (124 against an average month of 100); December is the quietest (62). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Virginia Beach?23464, with 485 of the 2,580 (19%); then 23452 (439).