Contractor Records
Home › Virginia Beach › Remodels & repairs

Remodel and repair permits in Virginia Beach, VA

Data through September 2026 · updated 18 Oct 2026

4,189 remodel and repair permits were issued in Virginia Beach, October 2024 through September 2026: about 2,094 a year and 12% of all permits. 2,199 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 11% more than the 1,990 in the 12 months before. The busiest month is April. The usual one took 39 days from issue to the city's final. 23464 has the most, 694.

4,189permits issued
2,199last 12 months
Aprbusiest month
39days, usual issue to final
77%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 165Oct2024Nov 2024: 152Dec 2024: 124Jan 2025: 163Jan2025Feb 2025: 133Mar 2025: 167Apr 2025: 184May 2025: 169Jun 2025: 161Jul 2025: 189JulAug 2025: 190Sep 2025: 193Oct 2025: 190Nov 2025: 150Dec 2025: 136Jan 2026: 150Jan2026Feb 2026: 136Mar 2026: 205Apr 2026: 243May 2026: 232Jun 2026: 194Jul 2026: 192JulAug 2026: 179Sep 2026: 192
The same numbers as a table
MonthPermits
Oct 2024165
Nov 2024152
Dec 2024124
Jan 2025163
Feb 2025133
Mar 2025167
Apr 2025184
May 2025169
Jun 2025161
Jul 2025189
Aug 2025190
Sep 2025193
Oct 2025190
Nov 2025150
Dec 2025136
Jan 2026150
Feb 2026136
Mar 2026205
Apr 2026243
May 2026232
Jun 2026194
Jul 2026192
Aug 2026179
Sep 2026192

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (122), December the quietest (74). A busy month at the permit counter usually means a longer wait for a contractor.

January: 90 (100 = an average month)February: 77 (100 = an average month)March: 107 (100 = an average month)April: 122 (100 = an average month)122May: 115 (100 = an average month)June: 102 (100 = an average month)July: 109 (100 = an average month)August: 106 (100 = an average month)September: 110 (100 = an average month)October: 102 (100 = an average month)November: 87 (100 = an average month)December: 74 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January90
February77
March107
April122
May115
June102
July109
August106
September110
October102
November87
December74

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,495 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,990
Finished76.6%
Expired0.1%
Usual days, issue to final39
Middle half, days14–107

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 4,189 remodel and repair permits.

ZIP codePermitsShare
2346469417%
2345468116%
2345667716%
2345258414%
2345556914%
2345143110%
234623388%
234531594%
23457531%
234321under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building - Addition and or Alteration4,15399%
Building - Roof and or Siding36under 1%

Download this table (CSV)

How Virginia Beach compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Virginia Beach Open Data, Building Permits Applications (data.virginiabeach.gov, ArcGIS layer Building_Permits_Applications_view), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Virginia Beach issues inside the city: building, electrical, mechanical, plumbing and gas permits for homes, plus the city's roof and siding permits. Commercial permits, moving and hauling, utility, civil site work, fire, elevator and amusement permits in the same file are not counted. Norfolk, Chesapeake and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor (its 'created by' field is a portal login), so there are no contractor lists, rankings or firm pages for Virginia Beach.
  • The file has no declared job value, so we show no costs.
  • Roof and siding permits are their own type in the file, with no homes-or-business split, so all of them are counted here. Solar, pools, fences, additions and sheds are sorted out of the city's broad 'addition and or alteration' building permits by their work description; decks, piers and bulkheads count under Other.
  • A permit counts as finished when the city marks it Final or Closed or gives it a final date. Closed also covers permits that needed no final inspection.
  • The data made available here has been modified for use from its original source, which is the City of Virginia Beach. Neither the City of Virginia Beach nor the Office of the Chief Information Officer (CIO) makes any claims as to the completeness, timeliness, accuracy or content of any data contained in this application; makes any representation of any kind, including, but not limited to, warranty of the accuracy or fitness for a particular use; nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. The data is subject to change as modifications and updates are complete. It is understood that the information contained in the web feed is being used at one's own risk.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Virginia Beach, VA", https://contractorrecords.com/virginia-beach/remodel-permits, data through September 2026, from the City of Virginia Beach Planning Department, Permits Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Virginia Beach issue a year?About 2,094 a year in Virginia Beach: 4,189 permits issued October 2024 through September 2026, 2,199 of them in the last 12 months.
  • How long does a remodel and repair permit take in Virginia Beach?The usual one took 39 days from issue to the city's final inspection, and the middle half took 14 to 107 days (1,495 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Virginia Beach file the most remodel and repair permits?April (122 against an average month of 100); December is the quietest (74). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Virginia Beach?23464, with 694 of the 4,189 (17%); then 23454 (681).