Roofing permits in Virginia Beach, VA

Data through September 2026 · updated 18 Oct 2026

697 roofing permits were issued in Virginia Beach, October 2024 through September 2026: about 348 a year and 2% of all permits. 389 roofing permits in the last 12 months (Oct 2025–Sep 2026), 26% more than the 308 in the 12 months before. The busiest month is August. The usual one took 42 days from issue to the city's final. 23462 has the most, 152.

697permits issued
389last 12 months
Augbusiest month
42days, usual issue to final
61%finished
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 45Oct2024Nov 2024: 38Dec 2024: 16Jan 2025: 14Jan2025Feb 2025: 5Mar 2025: 32Apr 2025: 30May 2025: 21Jun 2025: 24Jul 2025: 36JulAug 2025: 28Sep 2025: 19Oct 2025: 35Nov 2025: 33Dec 2025: 48Jan 2026: 19Jan2026Feb 2026: 24Mar 2026: 17Apr 2026: 27May 2026: 19Jun 2026: 38Jul 2026: 26JulAug 2026: 58Sep 2026: 45
The same numbers as a table
MonthPermits
Oct 202445
Nov 202438
Dec 202416
Jan 202514
Feb 20255
Mar 202532
Apr 202530
May 202521
Jun 202524
Jul 202536
Aug 202528
Sep 202519
Oct 202535
Nov 202533
Dec 202548
Jan 202619
Feb 202624
Mar 202617
Apr 202627
May 202619
Jun 202638
Jul 202626
Aug 202658
Sep 202645

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (148), February the quietest (50). A busy month at the permit counter usually means a longer wait for a contractor.

January: 57 (100 = an average month)February: 50 (100 = an average month)March: 84 (100 = an average month)April: 98 (100 = an average month)May: 69 (100 = an average month)June: 107 (100 = an average month)July: 107 (100 = an average month)August: 148 (100 = an average month)148September: 110 (100 = an average month)October: 138 (100 = an average month)November: 122 (100 = an average month)December: 110 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January57
February50
March84
April98
May69
June107
July107
August148
September110
October138
November122
December110

Download this table (CSV)

How long a roofing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 186 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025308
Finished61.0%
Expired0.0%
Usual days, issue to final42
Middle half, days22–87

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 697 roofing permits.

ZIP codePermitsShare
2346215222%
2345212919%
2345511116%
2345410114%
234646710%
23451659%
23453416%
23456233%
234636under 1%
234572under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building - Roof and or Siding65995%
Building - Addition and or Alteration385%

Download this table (CSV)

How Virginia Beach compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Virginia Beach Open Data, Building Permits Applications (data.virginiabeach.gov, ArcGIS layer Building_Permits_Applications_view), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Virginia Beach issues inside the city: building, electrical, mechanical, plumbing and gas permits for homes, plus the city's roof and siding permits. Commercial permits, moving and hauling, utility, civil site work, fire, elevator and amusement permits in the same file are not counted. Norfolk, Chesapeake and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor (its 'created by' field is a portal login), so there are no contractor lists, rankings or firm pages for Virginia Beach.
  • The file has no declared job value, so we show no costs.
  • Roof and siding permits are their own type in the file, with no homes-or-business split, so all of them are counted here. Solar, pools, fences, additions and sheds are sorted out of the city's broad 'addition and or alteration' building permits by their work description; decks, piers and bulkheads count under Other.
  • A permit counts as finished when the city marks it Final or Closed or gives it a final date. Closed also covers permits that needed no final inspection.
  • The data made available here has been modified for use from its original source, which is the City of Virginia Beach. Neither the City of Virginia Beach nor the Office of the Chief Information Officer (CIO) makes any claims as to the completeness, timeliness, accuracy or content of any data contained in this application; makes any representation of any kind, including, but not limited to, warranty of the accuracy or fitness for a particular use; nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. The data is subject to change as modifications and updates are complete. It is understood that the information contained in the web feed is being used at one's own risk.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in Virginia Beach, VA", https://contractorrecords.com/virginia-beach/roofing-permits, data through September 2026, from the City of Virginia Beach Planning Department, Permits Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does Virginia Beach issue a year?About 348 a year in Virginia Beach: 697 permits issued October 2024 through September 2026, 389 of them in the last 12 months.
  • How long does a roofing permit take in Virginia Beach?The usual one took 42 days from issue to the city's final inspection, and the middle half took 22 to 87 days (186 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Virginia Beach file the most roofing permits?August (148 against an average month of 100); February is the quietest (50). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Virginia Beach?23462, with 152 of the 697 (22%); then 23452 (129).