Demolition permits in Virginia Beach, VA

Data through September 2026 · updated 18 Oct 2026

383 demolition permits were issued in Virginia Beach, October 2024 through September 2026: about 192 a year and 1% of all permits. 199 demolition permits in the last 12 months (Oct 2025–Sep 2026), 8% more than the 184 in the 12 months before. The busiest month is September. The usual one took 14 days from issue to the city's final. 23451 has the most, 133.

383permits issued
199last 12 months
Sepbusiest month
14days, usual issue to final
95%finished
Sep 2026records through

Demolition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 17Oct2024Nov 2024: 13Dec 2024: 10Jan 2025: 15Jan2025Feb 2025: 13Mar 2025: 18Apr 2025: 11May 2025: 26Jun 2025: 16Jul 2025: 8JulAug 2025: 14Sep 2025: 23Oct 2025: 16Nov 2025: 10Dec 2025: 20Jan 2026: 15Jan2026Feb 2026: 12Mar 2026: 11Apr 2026: 22May 2026: 10Jun 2026: 9Jul 2026: 27JulAug 2026: 26Sep 2026: 21
The same numbers as a table
MonthPermits
Oct 202417
Nov 202413
Dec 202410
Jan 202515
Feb 202513
Mar 202518
Apr 202511
May 202526
Jun 202516
Jul 20258
Aug 202514
Sep 202523
Oct 202516
Nov 202510
Dec 202520
Jan 202615
Feb 202612
Mar 202611
Apr 202622
May 202610
Jun 20269
Jul 202627
Aug 202626
Sep 202621

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (138), November the quietest (72). A busy month at the permit counter usually means a longer wait for a contractor.

January: 94 (100 = an average month)February: 78 (100 = an average month)March: 91 (100 = an average month)April: 103 (100 = an average month)May: 113 (100 = an average month)June: 78 (100 = an average month)July: 110 (100 = an average month)August: 125 (100 = an average month)September: 138 (100 = an average month)138October: 103 (100 = an average month)November: 72 (100 = an average month)December: 94 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January94
February78
March91
April103
May113
June78
July110
August125
September138
October103
November72
December94

Download this table (CSV)

How long a demolition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 173 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025184
Finished95.1%
Expired0.0%
Usual days, issue to final14
Middle half, days7–34

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the city's 383 demolition permits.

ZIP codePermitsShare
2345113335%
234557119%
234545514%
234524111%
23456246%
23464246%
23462215%
23457103%
2345341%

Download this table (CSV)

How these numbers are made

Source: City of Virginia Beach Open Data, Building Permits Applications (data.virginiabeach.gov, ArcGIS layer Building_Permits_Applications_view), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Virginia Beach issues inside the city: building, electrical, mechanical, plumbing and gas permits for homes, plus the city's roof and siding permits. Commercial permits, moving and hauling, utility, civil site work, fire, elevator and amusement permits in the same file are not counted. Norfolk, Chesapeake and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor (its 'created by' field is a portal login), so there are no contractor lists, rankings or firm pages for Virginia Beach.
  • The file has no declared job value, so we show no costs.
  • Roof and siding permits are their own type in the file, with no homes-or-business split, so all of them are counted here. Solar, pools, fences, additions and sheds are sorted out of the city's broad 'addition and or alteration' building permits by their work description; decks, piers and bulkheads count under Other.
  • A permit counts as finished when the city marks it Final or Closed or gives it a final date. Closed also covers permits that needed no final inspection.
  • The data made available here has been modified for use from its original source, which is the City of Virginia Beach. Neither the City of Virginia Beach nor the Office of the Chief Information Officer (CIO) makes any claims as to the completeness, timeliness, accuracy or content of any data contained in this application; makes any representation of any kind, including, but not limited to, warranty of the accuracy or fitness for a particular use; nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. The data is subject to change as modifications and updates are complete. It is understood that the information contained in the web feed is being used at one's own risk.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in Virginia Beach, VA", https://contractorrecords.com/virginia-beach/demolition-permits, data through September 2026, from the City of Virginia Beach Planning Department, Permits Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: days to final · Demolition permits by ZIP code.

Common questions

  • How many demolition permits does Virginia Beach issue a year?About 192 a year in Virginia Beach: 383 permits issued October 2024 through September 2026, 199 of them in the last 12 months.
  • How long does a demolition permit take in Virginia Beach?The usual one took 14 days from issue to the city's final inspection, and the middle half took 7 to 34 days (173 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Virginia Beach file the most demolition permits?September (138 against an average month of 100); November is the quietest (72). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in Virginia Beach?23451, with 133 of the 383 (35%); then 23455 (71).