Electrical permits in Virginia Beach, VA

Data through September 2026 · updated 18 Oct 2026

6,621 electrical permits were issued in Virginia Beach, October 2024 through September 2026: about 3,310 a year and 19% of all permits. 3,284 electrical permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 3,337 in the 12 months before. The busiest month is April. The usual one took 32 days from issue to the city's final. 23456 has the most, 1,238.

6,621permits issued
3,284last 12 months
Aprbusiest month
32days, usual issue to final
87%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 291Oct2024Nov 2024: 280Dec 2024: 218Jan 2025: 260Jan2025Feb 2025: 240Mar 2025: 311Apr 2025: 315May 2025: 245Jun 2025: 283Jul 2025: 285JulAug 2025: 316Sep 2025: 293Oct 2025: 315Nov 2025: 209Dec 2025: 245Jan 2026: 282Jan2026Feb 2026: 274Mar 2026: 291Apr 2026: 305May 2026: 259Jun 2026: 326Jul 2026: 234JulAug 2026: 303Sep 2026: 241
The same numbers as a table
MonthPermits
Oct 2024291
Nov 2024280
Dec 2024218
Jan 2025260
Feb 2025240
Mar 2025311
Apr 2025315
May 2025245
Jun 2025283
Jul 2025285
Aug 2025316
Sep 2025293
Oct 2025315
Nov 2025209
Dec 2025245
Jan 2026282
Feb 2026274
Mar 2026291
Apr 2026305
May 2026259
Jun 2026326
Jul 2026234
Aug 2026303
Sep 2026241

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (112), December the quietest (84). A busy month at the permit counter usually means a longer wait for a contractor.

January: 98 (100 = an average month)February: 93 (100 = an average month)March: 109 (100 = an average month)April: 112 (100 = an average month)112May: 91 (100 = an average month)June: 110 (100 = an average month)July: 94 (100 = an average month)August: 112 (100 = an average month)September: 97 (100 = an average month)October: 110 (100 = an average month)November: 89 (100 = an average month)December: 84 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January98
February93
March109
April112
May91
June110
July94
August112
September97
October110
November89
December84

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 2,858 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20253,337
Finished86.7%
Expired0.1%
Usual days, issue to final32
Middle half, days8–111

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 6,621 electrical permits.

ZIP codePermitsShare
234561,23819%
234511,05716%
2345499615%
2346488113%
2345282412%
2345577512%
234624357%
234532774%
234571192%
235461under 1%

Download this table (CSV)

How Virginia Beach compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Virginia Beach Open Data, Building Permits Applications (data.virginiabeach.gov, ArcGIS layer Building_Permits_Applications_view), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Virginia Beach issues inside the city: building, electrical, mechanical, plumbing and gas permits for homes, plus the city's roof and siding permits. Commercial permits, moving and hauling, utility, civil site work, fire, elevator and amusement permits in the same file are not counted. Norfolk, Chesapeake and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor (its 'created by' field is a portal login), so there are no contractor lists, rankings or firm pages for Virginia Beach.
  • The file has no declared job value, so we show no costs.
  • Roof and siding permits are their own type in the file, with no homes-or-business split, so all of them are counted here. Solar, pools, fences, additions and sheds are sorted out of the city's broad 'addition and or alteration' building permits by their work description; decks, piers and bulkheads count under Other.
  • A permit counts as finished when the city marks it Final or Closed or gives it a final date. Closed also covers permits that needed no final inspection.
  • The data made available here has been modified for use from its original source, which is the City of Virginia Beach. Neither the City of Virginia Beach nor the Office of the Chief Information Officer (CIO) makes any claims as to the completeness, timeliness, accuracy or content of any data contained in this application; makes any representation of any kind, including, but not limited to, warranty of the accuracy or fitness for a particular use; nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. The data is subject to change as modifications and updates are complete. It is understood that the information contained in the web feed is being used at one's own risk.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Virginia Beach, VA", https://contractorrecords.com/virginia-beach/electrical-permits, data through September 2026, from the City of Virginia Beach Planning Department, Permits Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits by ZIP code.

Common questions

  • How many electrical permits does Virginia Beach issue a year?About 3,310 a year in Virginia Beach: 6,621 permits issued October 2024 through September 2026, 3,284 of them in the last 12 months.
  • How long does an electrical permit take in Virginia Beach?The usual one took 32 days from issue to the city's final inspection, and the middle half took 8 to 111 days (2,858 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Virginia Beach file the most electrical permits?April (112 against an average month of 100); December is the quietest (84). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Virginia Beach?23456, with 1,238 of the 6,621 (19%); then 23451 (1,057).