Data through September 2026 · updated 18 Oct 2026

8,227 plumbing permits were issued in Virginia Beach, October 2024 through September 2026: about 4,114 a year and 24% of all permits. 4,096 plumbing permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 4,131 in the 12 months before. The busiest month is April. The usual one took 21 days from issue to the city's final. 23451 has the most, 1,557.

8,227permits issued
4,096last 12 months
Aprbusiest month
21days, usual issue to final
86%finished
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 342Oct2024Nov 2024: 331Dec 2024: 323Jan 2025: 328Jan2025Feb 2025: 296Mar 2025: 353Apr 2025: 417May 2025: 345Jun 2025: 342Jul 2025: 347JulAug 2025: 345Sep 2025: 362Oct 2025: 350Nov 2025: 289Dec 2025: 291Jan 2026: 378Jan2026Feb 2026: 272Mar 2026: 410Apr 2026: 361May 2026: 347Jun 2026: 398Jul 2026: 340JulAug 2026: 341Sep 2026: 319
The same numbers as a table
MonthPermits
Oct 2024342
Nov 2024331
Dec 2024323
Jan 2025328
Feb 2025296
Mar 2025353
Apr 2025417
May 2025345
Jun 2025342
Jul 2025347
Aug 2025345
Sep 2025362
Oct 2025350
Nov 2025289
Dec 2025291
Jan 2026378
Feb 2026272
Mar 2026410
Apr 2026361
May 2026347
Jun 2026398
Jul 2026340
Aug 2026341
Sep 2026319

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (113), February the quietest (83). A busy month at the permit counter usually means a longer wait for a contractor.

January: 103 (100 = an average month)February: 83 (100 = an average month)March: 111 (100 = an average month)April: 113 (100 = an average month)113May: 101 (100 = an average month)June: 108 (100 = an average month)July: 100 (100 = an average month)August: 100 (100 = an average month)September: 99 (100 = an average month)October: 101 (100 = an average month)November: 90 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January103
February83
March111
April113
May101
June108
July100
August100
September99
October101
November90
December90

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 3,516 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20254,131
Finished86.5%
Expired0.0%
Usual days, issue to final21
Middle half, days6–107

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 8,227 plumbing permits.

ZIP codePermitsShare
234511,55719%
234561,55719%
234541,21615%
2345295912%
2345595412%
2346489211%
234626608%
234533144%
234571001%
234661under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing5,54767%
Gas2,68033%

Download this table (CSV)

How Virginia Beach compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Virginia Beach Open Data, Building Permits Applications (data.virginiabeach.gov, ArcGIS layer Building_Permits_Applications_view), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Virginia Beach issues inside the city: building, electrical, mechanical, plumbing and gas permits for homes, plus the city's roof and siding permits. Commercial permits, moving and hauling, utility, civil site work, fire, elevator and amusement permits in the same file are not counted. Norfolk, Chesapeake and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor (its 'created by' field is a portal login), so there are no contractor lists, rankings or firm pages for Virginia Beach.
  • The file has no declared job value, so we show no costs.
  • Roof and siding permits are their own type in the file, with no homes-or-business split, so all of them are counted here. Solar, pools, fences, additions and sheds are sorted out of the city's broad 'addition and or alteration' building permits by their work description; decks, piers and bulkheads count under Other.
  • A permit counts as finished when the city marks it Final or Closed or gives it a final date. Closed also covers permits that needed no final inspection.
  • The data made available here has been modified for use from its original source, which is the City of Virginia Beach. Neither the City of Virginia Beach nor the Office of the Chief Information Officer (CIO) makes any claims as to the completeness, timeliness, accuracy or content of any data contained in this application; makes any representation of any kind, including, but not limited to, warranty of the accuracy or fitness for a particular use; nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. The data is subject to change as modifications and updates are complete. It is understood that the information contained in the web feed is being used at one's own risk.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in Virginia Beach, VA", https://contractorrecords.com/virginia-beach/plumbing-permits, data through September 2026, from the City of Virginia Beach Planning Department, Permits Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Virginia Beach issue a year?About 4,114 a year in Virginia Beach: 8,227 permits issued October 2024 through September 2026, 4,096 of them in the last 12 months.
  • How long does a plumbing permit take in Virginia Beach?The usual one took 21 days from issue to the city's final inspection, and the middle half took 6 to 107 days (3,516 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Virginia Beach file the most plumbing permits?April (113 against an average month of 100); February is the quietest (83). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Virginia Beach?23451, with 1,557 of the 8,227 (19%); then 23456 (1,557).