How much does solar panel installation cost in Citrus Heights, CA? The usual solar & battery job filed with Citrus Heights, CA is $27,510, from 362 priced permits (October 2023 through September 2026); the middle half of firms file between $17,507 and $31,095. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual solar & battery job filed with Citrus Heights, CA is $27,510, from 362 priced permits, October 2023 through September 2026. The middle half of firms usually file between $17,507 and $31,095. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A solar & battery permit here usually takes 55 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 362 priced permits across 76 firms, pooled into one. Half of Citrus Heights, CA solar & battery permits were filed between $20,000 and $37,200.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $10,500 | 1 in 10 permits filed below |
| 25th | $20,000 | 1 in 4 filed below |
| 50th | $26,400 | the middle permit |
| 75th | $37,200 | 1 in 4 filed above |
| 90th | $49,100 | 1 in 10 filed above |
Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half | Finished |
|---|---|---|---|---|---|
| ES Solar | 78 | 56 | $34,000 | $20,000–$37,500 | 83.3% |
| Freedom Forever Northern California LLC | 34 | 32 | $37,623 | $29,053–$46,086 | — |
| Ilum Energy Solutions | 24 | 24 | $27,767 | $24,277–$39,267 | — |
| Axia Solar Corp | 19 | 12 | $27,620 | $24,600–$31,857 | 5 of 7 |
| Tesla Energy | 18 | 9 | $21,716 | $20,613–$28,436 | 7 of 9 |
| Haven Energy | 9 | 9 | $25,000 | $22,000–$41,375 | — |
| North Valley LLC | 10 | 8 | $38,041 | $29,000–$51,050 | — |
| Mars Home Solutions LLC | 6 | 6 | $27,619 | $18,475–$29,909 | — |
| Solar Savings Direct | 7 | 5 | $17,352 | $11,893–$25,611 | — |
| Spartan Home Services | 7 | 3 | $30,800 | $2,500–$34,896 | — |
Line your quote up against the file. In Citrus Heights, CA, 1 in 10 solar & battery filed values sit under $10,500, the middle half between $20,000 and $37,200, and 1 in 10 over $49,100.
Citrus Heights, CA files the fewest solar & battery permits in October (62 against an average month of 100) and the most in September (223). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Citrus Heights, CA →
Source: City of Citrus Heights building permits on homes (the city's issued-permits layer). The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Citrus Heights, CA →
Solar & Battery cost in other cities: Orlando New York City Chicago Cleveland Pittsburgh Miami Minneapolis St. Louis Colorado Springs Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Cape Coral Provo Palo Alto Denton Seattle San Francisco Medford Anaheim Elk Grove Tyler, TX Marin County (unincorporated) Sacramento County (unincorporated)
Other job costs in Citrus Heights, CA: HVAC · Roofing · Electrical & Panel · Water Heater · Remodel, Addition & Repair · Plumbing & Sewer · Windows & Doors · Patio Cover, Deck & Accessory Structure