How much does solar panel installation cost in Cape Coral? The usual solar & battery job filed with Cape Coral is $30,378, from 1,034 priced permits (January 2025 through September 2026); the middle half of firms file between $23,145 and $37,523. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$30,378usual filed value
$23,145–$37,523middle half of firms' usual jobs
1,034priced permits (100% of 1,034)
88firms on file
49days, permit issue to final
Sep 2026records through

How much does solar panel installation cost in Cape Coral?

The usual solar & battery job filed with Cape Coral is $30,378, from 1,034 priced permits, January 2025 through September 2026. The middle half of firms usually file between $23,145 and $37,523. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A solar & battery permit here usually takes 49 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 1,034 priced permits across 88 firms, pooled into one. Half of Cape Coral solar & battery permits were filed between $21,700 and $41,700.

PercentileFiled valueReads as
10th$13,9001 in 10 permits filed below
25th$21,7001 in 4 filed below
50th$30,500the middle permit
75th$41,7001 in 4 filed above
90th$56,3001 in 10 filed above

By home value

Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: the Florida Department of Revenue tax roll for Lee County (just value).

Firms working onUsual home valueUsual filed valueFirmsPermits
Lower thirdunder $299,969$33,02329431
Middle third$299,969–$386,639$28,70029423
Upper third$387,133 and up$35,25430180

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle halfFinished
Pjwd Energy LLC178108$33,023$26,010–$44,58099.7%
Momentum Solar10771$32,898$24,010–$42,63199.5%
Freedom Forever Florida LLC11936$28,700$20,010–$38,35394.5%
Sunvena Solar LLC3936$30,701$26,588–$36,726—
American Solar Intallation Company LLC4230$20,097$13,462–$28,89598.8%
Spectrum Solar Power LLC3030$23,145$16,807–$29,240—
Solar Energy Solutions of America Inc4323$35,000$29,574–$51,34999.2%
Affordable Solar Roof & Air LLC4319$31,760$25,287–$39,55092.6%
Stilwell Solar, LLC2519$35,500$25,155–$50,0007 of 7
Lunex Power Inc3316$27,878$22,464–$34,32599.0%

Why filed values run low or high

  • The 10 busiest firms usually file $32,898; the 65 firms with fewer than 10 permits usually file $25,000.
  • Firms working on the most expensive third of homes (usual home value $387,133 and up) usually file $35,254, against $33,023 for the least expensive third.
  • One permit type covers small and large jobs: 1 in 10 solar & battery permits is filed under $13,900 and 1 in 10 over $56,300, 4 times as much.
  • 100.0% of the 1,034 permits carry a value; the 0 without one are left out of every figure here.

Is your quote normal? Compare it with 1,034 filed values

Line your quote up against the file. In Cape Coral, 1 in 10 solar & battery filed values sit under $13,900, the middle half between $21,700 and $41,700, and 1 in 10 over $56,300.

  • $73,200Above $56,300: higher than 9 in 10 filed values for this work in Cape Coral.
  • $30,378Right at the usual $30,378: in the middle of the file.
  • $9,800Below $13,900: lower than 9 in 10. Ask what the quote leaves out.

When to schedule solar installation in Cape Coral

Cape Coral files the fewest solar & battery permits in January (57 against an average month of 100) and the most in December (156). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Cape Coral →

How these numbers are made

Source: City of Cape Coral building permits (the city's open permit table starts January 2025). The window is January 2025 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Cape Coral →

Common questions

  • How many quotes should I get for a solar & battery job in Cape Coral?At least three. In the permit record the middle half of Cape Coral solar & battery firms usually file between $23,145 and $37,523 a job, so two ordinary firms can sit 1.6 times apart and both be normal for Cape Coral. A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for solar & battery jobs in Cape Coral?Half of permits were filed between $21,700 and $41,700; 8 in 10 between $13,900 and $56,300. These are approximate, pooled from each firm's own spread.
  • How much do solar installers charge in Cape Coral?The usual solar & battery job is filed at $30,378; the middle half of firms usually file between $23,145 and $37,523. The 10 firms with the most permits in the last 12 months usually file $32,898, more than the usual. See every firm's usual job →
  • Why is this different from the per-watt prices I see online?Online prices are quoted per watt. A filed value is one number for the whole job on one permit, often many watts plus the work around them, and the Cape Coral file does not record how many each job covered, so we can't turn $30,378 into a price per watt.
  • Do bigger houses get bigger bills?In the file, yes for the firms: those working on the upper third of homes by value usually file $35,254, the lower third $33,023. That is firms, not single jobs.
  • Where does this data come from?City of Cape Coral building permits (the city's open permit table starts January 2025), read October 2026. How the records work in Cape Coral →

Solar & Battery cost in other cities: Orlando New York City Chicago Cleveland Pittsburgh Miami Minneapolis St. Louis Colorado Springs Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Provo Palo Alto Denton Seattle San Francisco Medford Anaheim Elk Grove Tyler, TX Marin County (unincorporated) Sacramento County (unincorporated) Citrus Heights, CA

Other job costs in Cape Coral: HVAC · Windows & Doors · Fence · New Home · Irrigation · Docks, Seawalls & Boat Lifts · Electrical · Screen Enclosure · Swimming Pool · Roofing · Shutters & Awnings · Plumbing & Gas · Garage Door · Driveway, Pavers & Slab · Generator · Remodel & Repair · Pergola, Gazebo & Shade · Pool Heater · Addition · Demolition · Shed