Solar Panel Installation Cost in Honolulu, HI: what the permits say

How much does solar panel installation cost in Honolulu? The usual solar job filed with Honolulu is $27,500, from 16,061 priced permits (July 2022 through June 2025); the middle half of firms file between $22,000 and $39,949. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$27,500usual filed value
$22,000–$39,949middle half of firms' usual jobs
16,061priced permits (100% of 16,068)
110firms on file
102days, permit issue to final
Jun 2025records through

How much does solar panel installation cost in Honolulu?

The usual solar job filed with Honolulu is $27,500, from 16,061 priced permits, July 2022 through June 2025. The middle half of firms usually file between $22,000 and $39,949. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A solar permit here usually takes 102 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 16,061 priced permits across 110 firms, pooled into one. Half of Honolulu solar permits were filed between $18,300 and $40,200.

PercentileFiled valueReads as
10th$10,0001 in 10 permits filed below
25th$18,3001 in 4 filed below
50th$27,600the middle permit
75th$40,2001 in 4 filed above
90th$56,0001 in 10 filed above

By home value

Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: 2022 assessed values for Honolulu parcels.

Firms working onUsual home valueUsual filed valueFirmsPermits
Lower thirdunder $1,017,100$30,000367,044
Middle third$1,017,100–$1,223,100$26,500368,579
Upper third$1,224,000 and up$16,00037444

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months on file (Jul 2024–Jun 2025). Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle halfFinished
Sunrun Installation Svs Inc4,7062,094$30,000$20,500–$41,00068.6%
Hawaii Energy Connection, LLC1,385410$30,000$17,000–$45,00094.8%
Revolusun LLC1,883391$23,000$14,000–$31,00094.8%
Alternate Energy, Inc1,375261$27,500$18,500–$40,50094.7%
Solartech Hawaii LLC771251$24,000$17,000–$37,37591.7%
Holu Hou Energy LLC280198$30,000$22,750–$41,50099.7%
Independent Energy Systems LLC414162$28,000$19,125–$35,75091.7%
Eco Solar, LLC669153$26,500$21,500–$40,00096.3%
Solarcity Corporation dba Tesla Energy753152$21,263$13,984–$28,38063.1%
Sunspear Energy LLC331129$31,114$20,200–$43,54694.4%

Why filed values run low or high

  • The 10 busiest firms usually file $30,000; the 64 firms with fewer than 10 permits usually file $33,500.
  • Firms working on the most expensive third of homes (usual home value $1,224,000 and up) usually file $16,000, against $30,000 for the least expensive third.
  • One permit type covers small and large jobs: 1 in 10 solar permits is filed under $10,000 and 1 in 10 over $56,000, 6 times as much.
  • 100.0% of the 16,068 permits carry a value; the 7 without one are left out of every figure here.

Is your quote normal? Compare it with 16,061 filed values

Line your quote up against the file. In Honolulu, 1 in 10 solar filed values sit under $10,000, the middle half between $18,300 and $40,200, and 1 in 10 over $56,000.

  • $72,700Above $56,000: higher than 9 in 10 filed values for this work in Honolulu.
  • $27,500Right at the usual $27,500: in the middle of the file.
  • $7,000Below $10,000: lower than 9 in 10. Ask what the quote leaves out.

When to schedule solar installation in Honolulu

Honolulu files the fewest solar permits in January (76 against an average month of 100) and the most in December (123). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Honolulu →

How these numbers are made

Source: City & County of Honolulu building permits (DPP). The window is July 2022 through June 2025; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Honolulu →

Common questions

  • How many quotes should I get for a solar job in Honolulu?At least three. In the permit record the middle half of Honolulu solar firms usually file between $22,000 and $39,949 a job, so two ordinary firms can sit 1.8 times apart and both be normal for Honolulu. A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for solar jobs in Honolulu?Half of permits were filed between $18,300 and $40,200; 8 in 10 between $10,000 and $56,000. These are approximate, pooled from each firm's own spread.
  • How much do solar installers charge in Honolulu?The usual solar job is filed at $27,500; the middle half of firms usually file between $22,000 and $39,949. The 10 firms with the most permits in the last 12 months on file (Jul 2024–Jun 2025) usually file $30,000, more than the usual. See every firm's usual job →
  • Why is this different from the per-watt prices I see online?Online prices are quoted per watt. A filed value is one number for the whole job on one permit, often many watts plus the work around them, and the Honolulu file does not record how many each job covered, so we can't turn $27,500 into a price per watt.
  • Do bigger houses get bigger bills?Not in the file: firms working on the upper third of homes by value usually file $16,000, the lower third $30,000.
  • Where does this data come from?City & County of Honolulu building permits (DPP), read July 2025. How the records work in Honolulu →

Solar cost in other cities: Orlando New York City Chicago Cleveland Pittsburgh Miami Minneapolis St. Louis Colorado Springs Albuquerque Boulder Greensboro Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Cape Coral Provo Palo Alto Denton Seattle San Francisco Medford Anaheim Elk Grove Tyler, TX Marin County (unincorporated) Sacramento County (unincorporated) Citrus Heights, CA