Solar Panel Installation Cost in Arlington, VA: what the permits say

How much does solar panel installation cost in Arlington, VA? The usual solar job filed with Arlington, VA is $16,000, from 608 priced permits (October 2023 through September 2026); the middle half of firms file between $9,166 and $26,000. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$16,000usual filed value
$9,166–$26,000middle half of firms' usual jobs
608priced permits (100% of 608)
41firms on file
47days, permit issue to final
Sep 2026records through

How much does solar panel installation cost in Arlington, VA?

The usual solar job filed with Arlington, VA is $16,000, from 608 priced permits, October 2023 through September 2026. The middle half of firms usually file between $9,166 and $26,000. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A solar permit here usually takes 47 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 608 priced permits across 41 firms, pooled into one. Half of Arlington, VA solar permits were filed between $5,900 and $27,600.

PercentileFiled valueReads as
10th$1,7001 in 10 permits filed below
25th$5,9001 in 4 filed below
50th$15,300the middle permit
75th$27,6001 in 4 filed above
90th$41,8001 in 10 filed above

By home value

Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: Arlington County 2026 assessed values.

Firms working onUsual home valueUsual filed valueFirmsPermits
Lower thirdunder $1,072,600$13,9401335
Middle third$1,072,600–$1,326,800$18,00014473
Upper third$1,344,500 and up$30,50014100

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle halfFinished
Solar Energy World LLC16152$18,000$11,000–$24,00099.9%
Convert Solar LLC3525$9,105$6,735–$12,07599.1%
Nova Solar Inc3418$5,840$4,460–$7,09099.3%
Ipsun Power Inc4816$30,500$17,072–$41,75599.6%
Ion Developer LLC2816$5,390$3,696–$8,85594.5%
Fusion Solar Services LLC819$22,000$15,000–$32,00099.8%
Equity Developement & Growth Enterprises Corp208$1,500$1,141–$1,96499.2%
Freedom Forever Virginia LLC156$13,940$10,595–$19,97586.5%
Nexus Energy Systems LLC1043$26,000$1,000–$41,00095.2%
Sky NRG Solar Inc113$18,600$14,500–$26,6208 of 9

Why filed values run low or high

  • The 10 busiest firms usually file $18,000; the 30 firms with fewer than 10 permits usually file $13,120.
  • Firms working on the most expensive third of homes (usual home value $1,344,500 and up) usually file $30,500, against $13,940 for the least expensive third.
  • One permit type covers small and large jobs: 1 in 10 solar permits is filed under $1,700 and 1 in 10 over $41,800, 24 times as much.
  • 100.0% of the 608 permits carry a value; the 0 without one are left out of every figure here.

Is your quote normal? Compare it with 608 filed values

Line your quote up against the file. In Arlington, VA, 1 in 10 solar filed values sit under $1,700, the middle half between $5,900 and $27,600, and 1 in 10 over $41,800.

  • $54,400Above $41,800: higher than 9 in 10 filed values for this work in Arlington, VA.
  • $16,000Right at the usual $16,000: in the middle of the file.
  • $1,200Below $1,700: lower than 9 in 10. Ask what the quote leaves out.

When to schedule solar installation in Arlington, VA

Arlington, VA files the fewest solar permits in February (34 against an average month of 100) and the most in October (223). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Arlington, VA →

How these numbers are made

Source: Arlington County, VA building and trade permits. The window is October 2023 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Arlington, VA →

Common questions

  • How many quotes should I get for a solar job in Arlington, VA?At least three. In the permit record the middle half of Arlington, VA solar firms usually file between $9,166 and $26,000 a job, so two ordinary firms can sit 2.8 times apart and both be normal for Arlington, VA. A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for solar jobs in Arlington, VA?Half of permits were filed between $5,900 and $27,600; 8 in 10 between $1,700 and $41,800. These are approximate, pooled from each firm's own spread.
  • How much do solar installers charge in Arlington, VA?The usual solar job is filed at $16,000; the middle half of firms usually file between $9,166 and $26,000. The 10 firms with the most permits in the last 12 months usually file $18,000, more than the usual. See every firm's usual job →
  • Why is this different from the per-watt prices I see online?Online prices are quoted per watt. A filed value is one number for the whole job on one permit, often many watts plus the work around them, and the Arlington, VA file does not record how many each job covered, so we can't turn $16,000 into a price per watt.
  • Do bigger houses get bigger bills?In the file, yes for the firms: those working on the upper third of homes by value usually file $30,500, the lower third $13,940. That is firms, not single jobs.
  • Where does this data come from?Arlington County, VA building and trade permits, read October 2026. How the records work in Arlington, VA →

Solar cost in other cities: Orlando New York City Chicago Cleveland Pittsburgh Miami Minneapolis St. Louis Colorado Springs Honolulu Albuquerque Boulder Greensboro Saint Paul Cambridge Somerville Cary Mesa Cape Coral Provo Palo Alto Denton Seattle San Francisco Medford Anaheim Elk Grove Tyler, TX Marin County (unincorporated) Sacramento County (unincorporated) Citrus Heights, CA