How much does solar panel installation cost in Cleveland? The usual solar job filed with Cleveland is $13,578, from 157 priced permits (October 2023 through September 2026); the middle half of firms file between $11,597 and $23,064. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$13,578usual filed value
$11,597–$23,064middle half of firms' usual jobs
157priced permits (100% of 157)
25firms on file
185days, permit issue to final
Sep 2026records through

How much does solar panel installation cost in Cleveland?

The usual solar job filed with Cleveland is $13,578, from 157 priced permits, October 2023 through September 2026. The middle half of firms usually file between $11,597 and $23,064. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A solar permit here usually takes 185 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 157 priced permits across 25 firms, pooled into one. Half of Cleveland solar permits were filed between $8,000 and $20,300.

PercentileFiled valueReads as
10th$5,3001 in 10 permits filed below
25th$8,0001 in 4 filed below
50th$13,400the middle permit
75th$20,3001 in 4 filed above
90th$31,0001 in 10 filed above

By home value

Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: Cuyahoga County parcel values.

Firms working onUsual home valueUsual filed valueFirmsPermits
Lower thirdunder $129,000$21,441857
Middle third$129,000–$185,000$12,960833
Upper third$208,500 and up$8,885967

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in; both are shown for firms with 5 or more priced permits. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle halfFinished
Yellowlite, Inc.5532$8,885$6,694–$12,74981.2%
Green Rack Contracting LLC.96$14,022$13,640–$16,523—
Sunergy Solar LLC.133$21,441$17,833–$32,21076.9%
Cne Electrical Contractors LLC.43———
Kin Home LLC32———
Complete Solar, Inc.22———
Power Up Renewable Energy181$23,064$17,095–$36,65361.5%
Arizona Solar Solutions, Inc11———
Empwr Solar, LLC11———
Judd Solar, LLC11———

Why filed values run low or high

  • The 10 busiest firms usually file $8,885; the 21 firms with fewer than 10 permits usually file $12,960.
  • Firms working on the most expensive third of homes (usual home value $208,500 and up) usually file $8,885, against $21,441 for the least expensive third.
  • One permit type covers small and large jobs: 1 in 10 solar permits is filed under $5,300 and 1 in 10 over $31,000, 6 times as much.
  • 100.0% of the 157 permits carry a value; the 0 without one are left out of every figure here.

Is your quote normal? Compare it with 157 filed values

Line your quote up against the file. In Cleveland, 1 in 10 solar filed values sit under $5,300, the middle half between $8,000 and $20,300, and 1 in 10 over $31,000.

  • $40,200Above $31,000: higher than 9 in 10 filed values for this work in Cleveland.
  • $13,578Right at the usual $13,578: in the middle of the file.
  • $3,700Below $5,300: lower than 9 in 10. Ask what the quote leaves out.

When to schedule solar installation in Cleveland

Cleveland files the fewest solar permits in April (23 against an average month of 100) and the most in October (222). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Cleveland →

How these numbers are made

Source: City of Cleveland building permits. The window is October 2023 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Cleveland →

Common questions

  • How many quotes should I get for a solar job in Cleveland?At least three. In the permit record the middle half of Cleveland solar firms usually file between $11,597 and $23,064 a job, so two ordinary firms can sit 2.0 times apart and both be normal for Cleveland. A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for solar jobs in Cleveland?Half of permits were filed between $8,000 and $20,300; 8 in 10 between $5,300 and $31,000. These are approximate, pooled from each firm's own spread.
  • How much do solar installers charge in Cleveland?The usual solar job is filed at $13,578; the middle half of firms usually file between $11,597 and $23,064. The 10 firms with the most permits in the last 12 months usually file $8,885, less than the usual. See every firm's usual job →
  • Why is this different from the per-watt prices I see online?Online prices are quoted per watt. A filed value is one number for the whole job on one permit, often many watts plus the work around them, and the Cleveland file does not record how many each job covered, so we can't turn $13,578 into a price per watt.
  • Do bigger houses get bigger bills?Not in the file: firms working on the upper third of homes by value usually file $8,885, the lower third $21,441.
  • Where does this data come from?City of Cleveland building permits, read October 2026. How the records work in Cleveland →

Solar cost in other cities: Orlando New York City Chicago Pittsburgh Miami Minneapolis St. Louis Colorado Springs Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Cape Coral Provo Palo Alto Denton Seattle San Francisco Medford Anaheim Elk Grove Tyler, TX Marin County (unincorporated) Sacramento County (unincorporated) Citrus Heights, CA

Other job costs in Cleveland: Plumbing · Roofing · HVAC · Electrical · Windows & Doors · Demolition · Remodel & Repair · Fence · Siding · New Home · Garage