How much does solar panel installation cost in Medford? The usual solar job filed with Medford is $23,000, from 642 priced permits (October 2023 through September 2026); the middle half of firms file between $17,317 and $27,171. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual solar job filed with Medford is $23,000, from 642 priced permits, October 2023 through September 2026. The middle half of firms usually file between $17,317 and $27,171. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A solar permit here usually takes 34 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 642 priced permits across 26 firms, pooled into one. Half of Medford solar permits were filed between $14,700 and $34,700.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $10,000 | 1 in 10 permits filed below |
| 25th | $14,700 | 1 in 4 filed below |
| 50th | $22,600 | the middle permit |
| 75th | $34,700 | 1 in 4 filed above |
| 90th | $49,400 | 1 in 10 filed above |
Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: Jackson County Assessor real market values (the city's July 2026 taxlot layer).
| Firms working on | Usual home value | Usual filed value | Firms | Permits |
|---|---|---|---|---|
| Lower third | under $420,370 | $18,000 | 8 | 251 |
| Middle third | $420,370–$483,710 | $28,424 | 9 | 301 |
| Upper third | $483,825 and up | $22,324 | 9 | 91 |
Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in; both are shown for firms with 5 or more priced permits. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half | Finished |
|---|---|---|---|---|---|
| Infinity Solar USA | 55 | 34 | $17,317 | $15,193–$22,139 | 95.5% |
| Complete Solar Inc | 28 | 27 | $20,149 | $14,538–$30,893 | — |
| Freedom Forever Oregon LLC | 122 | 15 | $18,000 | $12,000–$26,000 | 94.6% |
| True South Solar Inc | 56 | 12 | $22,324 | $14,857–$33,792 | 99.6% |
| Purelight Power Newco LLC | 209 | 9 | $28,424 | $20,664–$38,761 | 99.4% |
| Sunshine Solar Inc | 21 | 6 | $11,000 | $11,000 | 99.2% |
| Goodpwr LLC | 5 | 5 | $56,322 | $41,786–$73,470 | — |
| Summit Solar and Battery LLC | 3 | 3 | — | — | — |
| BRS Field Ops LLC | 54 | 2 | $49,140 | $33,966–$49,449 | 94.4% |
| Oregon Solar and Battery LLC | 2 | 2 | — | — | — |
Line your quote up against the file. In Medford, 1 in 10 solar filed values sit under $10,000, the middle half between $14,700 and $34,700, and 1 in 10 over $49,400.
Medford files the fewest solar permits in December (65 against an average month of 100) and the most in July (125). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Medford →
Source: City of Medford building, electrical, mechanical and plumbing permits on single-family, duplex and cottage homes (the city's TRAKiT permit exports). The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Medford →
Solar cost in other cities: Orlando New York City Chicago Cleveland Pittsburgh Miami Minneapolis St. Louis Colorado Springs Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Cape Coral Provo Palo Alto Denton Seattle San Francisco Anaheim Elk Grove Tyler, TX Marin County (unincorporated) Sacramento County (unincorporated) Citrus Heights, CA