Contractor Records
Home › Colorado Springs › Solar cost

Solar Panel Installation Cost in Colorado Springs, CO: what the permits say

How much does solar panel installation cost in Colorado Springs? The usual solar job filed with Colorado Springs is $13,600, from 3,030 priced permits (October 2023 through September 2026); the middle half of firms file between $2,850 and $20,120. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$13,600usual filed value
$2,850–$20,120middle half of firms' usual jobs
3,030priced permits (100% of 3,035)
140firms on file
41days, permit issue to final
Sep 2026records through

How much does solar panel installation cost in Colorado Springs?

The usual solar job filed with Colorado Springs is $13,600, from 3,030 priced permits, October 2023 through September 2026. The middle half of firms usually file between $2,850 and $20,120. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A solar permit here usually takes 41 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 3,030 priced permits across 140 firms, pooled into one. Half of Colorado Springs solar permits were filed between $3,300 and $23,300.

PercentileFiled valueReads as
10th$1,7001 in 10 permits filed below
25th$3,3001 in 4 filed below
50th$12,900the middle permit
75th$23,3001 in 4 filed above
90th$35,4001 in 10 filed above

By home value

Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: El Paso County Assessor market values.

Firms working onUsual home valueUsual filed valueFirmsPermits
Lower thirdunder $458,359$21,84046666
Middle third$458,359–$540,732$18,480471,817
Upper third$541,248 and up$10,08947552

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle half
Ion Developer, LLC.651168$18,480$13,760–$23,520
Detach Reset Solar LLC12835$2,500$2,500
MD Roofing and Solar8135$4,000$2,600–$6,525
JK Investments Inc5433$1,200$1,000–$1,700
Photon Brothers, Inc.13931$9,500$5,350–$34,800
Remove and Replace Solar Inc.7227$2,900$2,197–$4,100
Solar RNR LLC3722$1,755$1,400–$2,970
Sundragon Enterprises LLC2020$24,640$17,600–$35,340
Triton Roofing & Solar4119$10,089$5,000–$16,800
Proud American Electrical Inc8618$20,120$3,500–$32,280

Why filed values run low or high

  • The 10 busiest firms usually file $18,480; the 91 firms with fewer than 10 permits usually file $5,500.
  • Firms working on the most expensive third of homes (usual home value $541,248 and up) usually file $10,089, against $21,840 for the least expensive third.
  • One permit type covers small and large jobs: 1 in 10 solar permits is filed under $1,700 and 1 in 10 over $35,400, 21 times as much.
  • 99.8% of the 3,035 permits carry a value; the 5 without one are left out of every figure here.

Is your quote normal? Compare it with 3,030 filed values

Line your quote up against the file. In Colorado Springs, 1 in 10 solar filed values sit under $1,700, the middle half between $3,300 and $23,300, and 1 in 10 over $35,400.

  • $46,100Above $35,400: higher than 9 in 10 filed values for this work in Colorado Springs.
  • $13,600Right at the usual $13,600: in the middle of the file.
  • $1,200Below $1,700: lower than 9 in 10. Ask what the quote leaves out.

When to schedule solar installation in Colorado Springs

Colorado Springs files the fewest solar permits in February (73 against an average month of 100) and the most in October (180). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Colorado Springs →

How these numbers are made

Source: Pikes Peak Regional Building Department permits inside Colorado Springs city limits. The window is October 2023 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Colorado Springs →

Common questions

  • How many quotes should I get for a solar job in Colorado Springs?At least three. In the permit record the middle half of Colorado Springs solar firms usually file between $2,850 and $20,120 a job, so two ordinary firms can sit 7.1 times apart and both be normal for Colorado Springs. A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for solar jobs in Colorado Springs?Half of permits were filed between $3,300 and $23,300; 8 in 10 between $1,700 and $35,400. These are approximate, pooled from each firm's own spread.
  • How much do solar installers charge in Colorado Springs?The usual solar job is filed at $13,600; the middle half of firms usually file between $2,850 and $20,120. The 10 firms with the most permits in the last 12 months usually file $18,480, more than the usual. See every firm's usual job →
  • Why is this different from the per-watt prices I see online?Online prices are quoted per watt. A filed value is one number for the whole job on one permit, often many watts plus the work around them, and the Colorado Springs file does not record how many each job covered, so we can't turn $13,600 into a price per watt.
  • Do bigger houses get bigger bills?Not in the file: firms working on the upper third of homes by value usually file $10,089, the lower third $21,840.
  • Where does this data come from?Pikes Peak Regional Building Department permits inside Colorado Springs city limits, read October 2026. How the records work in Colorado Springs →

Solar cost in other cities: Orlando New York City Chicago Cleveland Pittsburgh Miami Minneapolis St. Louis Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Cape Coral Provo Palo Alto Denton Seattle San Francisco Medford Anaheim Elk Grove Tyler, TX Marin County (unincorporated) Sacramento County (unincorporated) Citrus Heights, CA

Other job costs in Colorado Springs: Roofing · HVAC & Mechanical · Electrical · Plumbing · New Home · Deck, Patio Cover & Pergola · Remodel & Addition · Siding & Stucco · Foundation & Structural Repair · Basement Finish · Garage & Accessory Building